Open Access
Issue
E3S Web Conf.
Volume 65, 2018
International Conference on Civil and Environmental Engineering (ICCEE 2018)
Article Number 06005
Number of page(s) 9
Section Geotechnical Engineering
DOI https://doi.org/10.1051/e3sconf/20186506005
Published online 26 November 2018
  1. S. Glendinning, C. Rogers, Deep stabilisation using lime (1996) [Google Scholar]
  2. G. Rajasekaran, S. N. Rao, Soil and Foundations, 37, 97-104 (1997) [Google Scholar]
  3. G. West, D. R. Carder, Review of lime piles and lime stabilised soil columns (1997) [Google Scholar]
  4. Coastal Development Institute of Technology, The deep mixing method principle, design and construction (2002) [Google Scholar]
  5. B. B. Broms, Ground Improvement, 252-330 (2004) [Google Scholar]
  6. A. Arulrajah, A. Abdullah, M. Bo, A. Buoazza, Ground Improvement, 162, G11, 3-14 (2009) [CrossRef] [Google Scholar]
  7. B. B. Broms, Stabilization of soil with lime column. (1984) [Google Scholar]
  8. M. Kivelo, B. B. Brom, Dry Mix Methods for Deep Soil Stabilization, 193-200 (1999) [Google Scholar]
  9. S. Larsson, B. B. Broms, Proceedings of International Conference on Dry Mix Methods (2000) [Google Scholar]
  10. M. Kitazume, K. Maruyama, The 17th International Offshore and Polar Engineering Conference (2007) [Google Scholar]
  11. B. Charbit, Numerical analysis of laterally loaded lime/cement columns (2009) [Google Scholar]
  12. J. Gniel, A. Bouazza, Geotext Geomembranes, 27, 167-175 (2009) [CrossRef] [Google Scholar]
  13. C. S. Wu, Y. S. Hong, Geotext Geomembranes, 27, 2, 107-120 (2009) [CrossRef] [Google Scholar]
  14. B. Idi, M. Kamarudin, “Asian Journal of Earth Sciences, 5, 2, 36-49 (2012) [CrossRef] [Google Scholar]
  15. S. Y. Chong, K. A. Kassim, EJGE, 19, K (2014) [Google Scholar]
  16. S. Y. Chong, K. A. Kassim, EJGE, 19, A (2014) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.