Open Access
Issue
E3S Web Conf.
Volume 97, 2019
XXII International Scientific Conference “Construction the Formation of Living Environment” (FORM-2019)
Article Number 01025
Number of page(s) 7
Section Smart City
DOI https://doi.org/10.1051/e3sconf/20199701025
Published online 29 May 2019
  1. Akinci B, Boukamp F, Gordon C, Huber D, Lyons C, Park K. A formalism for utilization of sensor systems and integrated project models for active construction quality control. Automation in Construction 2006;15:124–38. [CrossRef] [Google Scholar]
  2. Becerik-Gerber B, Jazizadeh F, Li N, Calis G. Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management 2012;138:431–42 [Google Scholar]
  3. Becerik-Gerber B, Rice S. The perceived value of building information modeling in the U.S. building industry. ITcon 2010;15:185–201. [Google Scholar]
  4. Becerik-Gerber B, Rice S. The perceived value of building information modeling in the U.S. building industry. ITcon 2010;15:185–201. [Google Scholar]
  5. Costin, Pradhananga, Teizer. Leveraging passive RFID technology for construction resource, field mobility and status monitoring in a high-rise renovation project. Automation in Construction 2012;24:1–15. [CrossRef] [Google Scholar]
  6. Eastman, Teicholz, Sacks, Liston. BIM Handbook A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. 2. Aufl. Hoboken: Wiley; 2011. [Google Scholar]
  7. Gray M, Grey J, Teo M,Chi S “Building Information Modeling: An International Survey”, Bishbane, Australia, 2013 [Google Scholar]
  8. Gray M, Gray J, Teo M, Chi S, Cheung F. Building Information Modeling: An International survey, Brisbane, Australia: 2013. [Google Scholar]
  9. Gu N, London K. Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction 2010;19:988–99. [Google Scholar]
  10. Hosseini R, Azari E, Tivendale L, Chileshe N, “Barriers to adoption of building information modeling (BIM) in Iran: Preliminary results”, 2015, 384-394 [Google Scholar]
  11. ISO Standard. ISO29481-1:2016 Building Information Modeling –Information Delivery Manual-Part1 Methodology and format, 2016 [Google Scholar]
  12. Jehle P, Seyffert S, Wagner S, Michailenko N. Das intelligente Bauteil im integrierten Gebäudemodell Pilotprojekt zur Anwendung der RFID-Technologie in Bauteilen. 1. Aufl. Wiesbaden: Vieweg+Teubner Research; 2011. [Google Scholar]
  13. Kado. D., &Avul. T. M., (2010). The Influence of Construction Supervisors’ Training on Rework, Construction Focus, Vol 3, No 1, pp 35-48. [Google Scholar]
  14. Krygiel E, Nies B. Green BIM: successful sustainable design with building information modeling. Indianapolis, Indiana: Wiley Publishing; 2008. [Google Scholar]
  15. Maria Joao Silva,Fillipa Salvado,Paula Couto,Alvaro Vale e Azevedo.”Roadmap Proposal for Implementing Building Information Modeling (BIM) in Portugal”, Open Journal of Civil Engineering, 2016, Vol. 6 [Google Scholar]
  16. Mill T, Alt A, Liias R. Combined 3D building surveying techniques – terrestrial laser scanning (TLS) and total station surveying for BIM data management purposes. Journal of Civil Engineering and Management 2013;iFirst 1-10, Published online: 24 Oct 2013. [Google Scholar]
  17. Nanajkar A,Gao Z “BIM Implementation Practices at India’s AEC Firms”, Kunming, China, 2014 [Google Scholar]
  18. National Building Information Modelling Initiative (NBI), BEIIC (the Built Environment Industry Innovation Council), Australia, 2012. [Google Scholar]
  19. Penttila H, Rajala M,Freese S Building Information Modeling of Modern Historic Buildings. 607-613, 2007 [Google Scholar]
  20. RICS. RICS BIM survey results. The Royal Institute of Charted Surveyors; 2013. [Google Scholar]
  21. Tang P, Huber D, Akinci B, Lipman R, Lytle A. Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques. Automation in Construction 2010;19:829–43. [CrossRef] [Google Scholar]
  22. Wong A, Wong F “Comperative Roles of Major Stakeholders for the Implementation of BIM [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.