Open Access
Issue
E3S Web Conf.
Volume 123, 2019
Ukrainian School of Mining Engineering - 2019
Article Number 01049
Number of page(s) 13
DOI https://doi.org/10.1051/e3sconf/201912301049
Published online 22 October 2019
  1. Moldabayev, S., Rysbayuly, B., Sultanbekova, Z., & Sarybayev, N. (2016). 3D modeling of phased development of mining operations on steeply dipping round deposits. In 6th International Conference on Computer Applications in the Minerals Industries Istanbul (CAMI 2016). Istanbul, Turkey, (43), 5. [Google Scholar]
  2. Moldabayev, S.K., Rysbayuly, B., Sultanbekova, Z.Z., & Sarybayev, N.O. (2016). Creation of a 3D model of development of open pit mining steeply dipping round open pit mines. Heotekhnichna Mekhanika, (129), 82-91. [Google Scholar]
  3. Moldabayev, S., Rysbayuly, B., Sultanbekova, Z., Aben, Y., & Sarybayev, N. (2016). Dynamic model of new order of working zone forming realization on steep boards of oval form quarries. 6th International Conference on Computer Applications in the Minerals Industries (CAMI 2016). Istanbul, Turkey, (20), 7. [Google Scholar]
  4. Askari-Nasab, H., Frimpongt, S., & Szymanski, J. (2008). Inverstigating continuous time open pit dynamics. The Journal of the Southern African Institute of Mining and Metallurgy, 63-71. [Google Scholar]
  5. Elahi zeyni, Е., Kakaie, R., & Yousefi, A. (2011) A new algorithm for optimum open pit design: Floating cone method III. Journal of Mining & Environment, (2/2), 118-125. [Google Scholar]
  6. Souza, M.J.F., Coelho, I.M., Ribas, S., Santos, H.G., & Merschmann, L.H.C. (2010). A hybrid heuristic algorithm for the open-pit-mining operational planning problem. European Journal of Operational Research, 207(2), 1041-1051. https://doi.org/10.1016/j.ejor.2010.05.031 [Google Scholar]
  7. Belov, O., Shustov, O., Adamchuk, A., & Hladun, O. (2018). Complex Processing of Brown Coal in Ukraine: History, Experience, Practice, Prospects. Solid State Phenomena, (277), 251-268. https://doi.org/10.4028/www.scientific.net/ssp.277.251 [CrossRef] [Google Scholar]
  8. Dryzhenko, A., Shustov, A., & Moldabayev, S. (2017). Justification of parameters of building inclined trenches using belt conveyors. International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM, 17(13), 471-478. [Google Scholar]
  9. Kalybekov, T., Rysbekov, K., & Zhakypbek, Y. (2015). Efficient land use in open-cut mining. New Developments in Mining Engineering 2015: Theoretical and Practical Solutions of Mineral Resources Mining, 287-291. https://doi.org/10.1201/b19901-51 [CrossRef] [Google Scholar]
  10. Cherniaiev, O.V. (2017). Systematization of the hard rock non-metallic mineral deposits for improvement of their mining technologies. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (5), 11-17. [Google Scholar]
  11. Dryzhenko, A., Moldabayev, S., Shustov, A., Adamchuk, A., & Sarybayev, N. (2017). Open pit mining technology of steeply dipping mineral occurences by steeply inclined sublayers. International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM, 17(13), 599-606. https://doi.org/10.5593/sgem2017/13/s03.076 [Google Scholar]
  12. Malanchuk, Z.R. (2019). Substantiating parameters of zeolite-smectite puff-stone washout and migration within an extraction chamber. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (6). Accepted paper. [Google Scholar]
  13. Morales, N., & Reyes, P. (2016). Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process. Journal of the Southern African Institute of Mining and Metallurgy, 116(7), 663-672. https://doi.org/10.17159/2411-9717/2016/v116n7a8 [Google Scholar]
  14. Saavedra-Rosas, J., Jelvez, E., Amaya, J., & Morales, N. (2016). Optimizing open-pit block scheduling with exposed ore reserve. Journal of the Southern African Institute of Mining and Metallurgy, 116(7), 655-662. https://doi.org/10.17159/2411-9717/2016/v116n7a7 [Google Scholar]
  15. Samavati, M., Essam, D., Nehring, M., & Sarker, R. (2017). A local branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research, 257(1), 261-271. https://doi.org/10.1016/j.ejor.2016.07.004 [Google Scholar]
  16. Moldabayev, S., & Aben, E. (2016). New technology production mining on a steep board deep pits. International Journal of Applied Engineering Research: Research India Publications, (22), 10458-10464. [Google Scholar]
  17. Rakishev, B.R., & Moldabayev, S.K. (2015). Justification of formation order of working zones on deep open pit mines with excavator-automobile complexes. Mining Informational and Analytical Bulletin, (1), 27-34. [Google Scholar]
  18. Diwekar, U. (2008). Introduction to Applied Optimization. New York: Springer. [CrossRef] [Google Scholar]
  19. Hillier, F.S., & Lieberman, G.J. (2014). Introduction to Operations Research. McGraw Hill Higher Education. [Google Scholar]
  20. Antoniou, A., & Lu, W.-S. (2007). Practical Optimization. Algorithms and Engineering Applications. New York: Springer. [Google Scholar]
  21. Fu, M.C. (2015). Handbook of Simulation Optimization. New York: Springer. [Google Scholar]
  22. Moldabayev, S.K., Rysbaiuy, B., & Sultanbekova, Zh.Zh. (2013). Justification of Countours Belonging to the Stages of Mining Steeply Dipping Deposits Using the Solution of the Problem of Nonlinear programming. Proceedings of the 22nd MPES Conference. Mine Planning and Equipment Selection. Dresden, (1), 125-132. [Google Scholar]
  23. Moldabayev, S., & Rysbaiuly, B. (2015). Solution of nonlinear programming problem by Bellman method while optimizing the two-level mining of benches in deep open pits. New Developments in Mining Engineering 2015: Theoretical and Practical Solutions of Mineral Resources Mining, 49-53. https://doi.org/10.1201/b19901-10 [CrossRef] [Google Scholar]
  24. Moldabayev, S.K., Rysbaiuly, B., & Sultanbekova, Z.Z. (2015). Аutomation of calculation of optimal parameters of two-level mining of benches with cross-section panels by excavator-auto truck complexes. The 23rd International symposium on mine planning & equipment selection. Johannesburg, South Africa, 1139-1146. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.