Open Access
Issue |
E3S Web Conf.
Volume 132, 2019
XXII International Scientific Conference POLSITA 2019 “Progress of mechanical engineering supported by information technology”
|
|
---|---|---|
Article Number | 01011 | |
Number of page(s) | 6 | |
Section | Engineering and Technology | |
DOI | https://doi.org/10.1051/e3sconf/201913201011 | |
Published online | 22 November 2019 |
- A. Kozieradzka (red.), Podstawy zarządzania produkcją. Politechnika Warszawska, Warsaw, (2016). [Google Scholar]
- E. Macha, Niezawodność maszyn. Oficyna Wydawnicza PO, (2001). [Google Scholar]
- S. Nakajima, TPM Tenkai. Japan Institute of Plant Maintenance, Tokyo, (1982). [Google Scholar]
- Y. Takahashi, O. Takash, TPM, Total Productive Maintenance. Quality Resources, (1990). [Google Scholar]
- S. Nakajima, Introduction to TPM: Total Productive Maintenance (Translation), Productivity Press, Inc., 1988, pp. 129, (1988). [Google Scholar]
- PN-EN 15341:2007 Maintenance – Maintenance Key Performance Indicators, Polski Komitet Normalizacyjny, Warsaw (2007). [Google Scholar]
- A. Grycuk, Przegl. Organ., 2, 28–31, (2010). [CrossRef] [Google Scholar]
- A. Adamkiewicz, A. Burnos, Zeszyty Naukowe Akademii Marynarki Wojennej, 2 189, (2012). [Google Scholar]
- Z. Kowalczyk, M. Cupiał, Estimation methods of the agricultural equipment value with regard to evaluation of Alina carrot harvester. Contemporary Research Trends in Agricultural Engineering BIO Web Conf., 10 (2018). [Google Scholar]
- E. Popardowski, D. Kwaśniewski, Technical-Economic Aspects Of The Eradication Of Energy Willow Plantations, in: Proceedings of 24th International PhD Students Conference (MendelNet 2017) / Cerkal Radim [et al.] (ed. ), Mendel University, 808-813, (2017). [Google Scholar]
- A. Loska, Komputerowo zintegrowane zarządzanie, 2, 37-46, (2011). [Google Scholar]
- K. Stecuła, Zarządzanie Przedsiębiorstwem 19, (2016). [Google Scholar]
- R. Oechsner et al., Materials Science in Semiconductor Processing, 5 4-5, 333-339, (2002). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.