  1. M. Chalker and M. Loosemore, “Trust and productivity in Australian construction projects: A subcontractor perspective, ” Eng. Constr. Archit. Manag., Vol. 23, no. 2, pp. 192–210, 2016. [CrossRef] [Google Scholar]
  2. F. C. Chia, M. Skitmore, J. Gray, and A. Bridge, “International comparisons of nominal and real construction labour productivity, ” Eng. Constr. Archit. Manag., Vol. 25, no. 7, pp. 896–915, 2018. [CrossRef] [Google Scholar]
  3. A. T. Gurmu, “Identifying and prioritizing safety practices affecting construction labour productivity: An empirical study, ” Int. J. Product. Perform. Manag., 2019. [Google Scholar]
  4. D. C. Dacy, “Productivity and price trends in construction since 1947, ” Rev. Econ. Stat., Vol. 47, no. 4, pp. 406–411, 1965. [Google Scholar]
  5. S. G. Allen, “Why Construction Industry Productivity Is Declining Author ( s ): Steven G. Allen Source: The Review of Economics and Statistics, Vol. 67, No . 4 (Nov ., 1985), pp. 661-669 Published by: The MIT Press Stable URL: http://www.jstor.org/stable/1924, ” Vol. 67, no. 4, pp. 661–669, 2016. [CrossRef] [Google Scholar]
  6. E.-B. Lee, H. Lee, and C. W. Ibbs, “Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction, ” J. Constr. Eng. Manag., Vol. 133, no. 10, pp. 798–806, 2007. [Google Scholar]
  7. U. C. Gatti, G. C. Migliaccio, S. M. Bogus, and S. Schneider, “An exploratory study of the relationship between construction workforce physical strain and task level productivity, ” Constr. Manag. Econ., Vol. 32, no. 6, pp. 548–564, 2014. [CrossRef] [Google Scholar]
  8. L. Borg and H.-S. Song, “Quality Change and Implications for Productivity Development: Housing Construction in Sweden 1990–2010, ” J. Constr. Eng. Manag., Vol. 141, no. 1, p. 05014014, 2015. [Google Scholar]
  9. I. Mahamid, “Contractors perspective toward factors affecting labor productivity in building construction, ” Eng. Constr. Archit. Manag., Vol. 20, no. 5, pp. 446–460, 2013. [CrossRef] [Google Scholar]
  10. A. V. Thomas and J. Sudhakumar, “Critical analysis of the key factors affecting construction labour productivity -an Indian perspective, ” Int. J. Constr. Manag., Vol. 13, no. 4, pp. 103–125, 2013. [Google Scholar]
  11. H. Karimi, T. R. B. Taylor, and P. M. Goodrum, “Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance, ” Constr. Manag. Econ., Vol. 35, no. 6, pp. 368–380, 2017. [CrossRef] [Google Scholar]
  12. L. Ruddock and S. Ruddock, “Evaluation of trends in the UK construction industry using growth and productivity accounts, ” Constr. Manag. Econ., Vol. 29, no. 12, pp. 1229–1239, 2011. [CrossRef] [Google Scholar]
  13. R. Pellegrino, N. Costantino, R. Pietroforte, and S. Sancilio, “Construction of multi-storey concrete structures in Italy: Patterns of productivity and learning curves, ” Constr. Manag. Econ., Vol. 30, no. 2, pp. 103–115, 2012. [CrossRef] [Google Scholar]
  14. B. Vogl, “Measuring Construction: Prices, Output and Productivity, ” Constr. Manag. Econ., Vol. 33, no. 9, pp. 775–777, 2015. [CrossRef] [Google Scholar]
  15. Y. Li and C. Liu, “Malmquist indices of total factor productivity changes in the Australian construction industry, ” Constr. Manag. Econ., Vol. 28, no. 9, pp. 933–945, 2010. [Google Scholar]
  16. W. Chancellor and W. Lu, “A Regional and Provincial Productivity Analysis of the Chinese Construction Industry: 1995 to 2012, ” J. Constr. Eng. Manag., Vol. 142, no. 11, p. 05016013, 2016. [Google Scholar]
  17. D. Zhai, P. M. Goodrum, C. T. Haas, and C. H. Caldas, “Relationship between Automation and Integration of Construction Information Systems and Labor Productivity, ” J. Constr. Eng. Manag., Vol. 135, no. 8, pp. 746–753, 2009. [Google Scholar]
  18. E. M. Generalova, V. P. Generalov, and A. A. Kuznetsova, “Modular Buildings in Modern Construction, ” Procedia Eng., Vol. 153, pp. 167–172, 2016. [Google Scholar]
  19. L. Ma, C. Liu, and A. Mills, “Construction labor productivity convergence: a conditional frontier approach,” Eng. Constr. Archit. Manag., Vol. 23, no. 3, pp. 283–301, 2016. [CrossRef] [Google Scholar]
  20. S. Dixit, “Analysing Enabling Factors Affecting the On-site Productivity in Indian Construction Industry,” Period. Polytech. Archit., Vol. 49, no. 2, pp. 185–193, Nov. 2018. [CrossRef] [Google Scholar]
  21. P. Minde, “Labour productivity in construction activity,” Vol. 5, no. I, p. 2012, 2012. [Google Scholar]
  22. S. Dabirian, M. Khanzadi, and R. Taheriattar, “Qualitative Modeling of Sustainability Performance in Construction Projects Considering Productivity Approach, ” Int. J. Civ. Eng., Vol. 15, no. 8, pp. 1143–1158, 2017. [CrossRef] [Google Scholar]
  23. P. Forsythe, “Extending and operationalizing construction productivity measurement on building projects,” Constr. Manag. Econ., Vol. 36, no. 12, pp. 683–699, 2018. [CrossRef] [Google Scholar]
  24. A. T. Gurmu and A. A. Aibinu, “Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects,” J. Constr. Eng. Manag., Vol. 143, no. 10, p. 04017081, 2017. [Google Scholar]
  25. L. Ma, C. Liu, and A. Mills, “Construction labor productivity convergence: A conditional frontier approach, ” Eng. Constr. Archit. Manag., Vol. 23, no. 3, pp. 283–301, 2016. [CrossRef] [Google Scholar]
  26. M. Productivity and O. Manual, “Measurement of aggregate and industry-level productivity growth,” Organ. Econ. co-operation Dev., pp. 11–18, 2001. [Google Scholar]
  27. R. Hughes and D. Thorpe, “A review of enabling factors in construction industry productivity in an Australian environment,” Constr. Innov., Vol. 14, no. 2, pp. 210–228, 2014. [CrossRef] [Google Scholar]
  28. Australian Productivity Commission, Public infrastructure: inquiry report, Vol. 1, no. 71. 2014. [Google Scholar]
  29. S. Dixit, S. N. Mandal, J. V. Thanikal, and K. Saurabh, “Evolution of studies in construction productivity: A systematic literature review (2006–2017), ” Ain Shams Eng. J., no. xxxx, 2019. [Google Scholar]
  30. M. Chalker and M. Loosemore, “Trust and productivity in Australian construction projects: a subcontractor perspective,” Eng. Constr. Archit. Manag., Vol. 23, no. 2, pp. 192–210, 2016. [CrossRef] [Google Scholar]
  31. M. A. Azman, C. K. H. Hon, M. Skitmore, B. L. Lee, and B. Xia, “A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia,” Constr. Manag. Econ., Vol. 37, no. 2, pp. 72–88, 2019. [CrossRef] [Google Scholar]
  32. X. Hu and C. Liu, “Energy productivity and total-factor productivity in the Australian construction industry,” Archit. Sci. Rev., Vol. 59, no. 5, pp. 432–444, 2016. [Google Scholar]
  33. L. Ruddock and S. Ruddock, “Reassessing productivity in the construction sector to reflect hidden innovation and the knowledge economy,” Constr. Manag. Econ., Vol. 27, no. 9, pp. 871–879, 2009. [CrossRef] [Google Scholar]
  34. S. Dixit, S. N. Mandal, J. V Thanikal, and K. Saurabh, “Construction Productivity and Construction Project Performance in Indian Construction Projects,” vol. m, no. July, pp. 379–386, 2018. [Google Scholar]
  35. R. Kenley, “Productivity improvement in the construction process, ” Constr. Manag. Econ., Vol. 32, no. 6, pp. 489–494, 2014. [CrossRef] [Google Scholar]
  36. L. S. Pheng, G. Shang, and W. K. Foong, “Enhancing Construction Productivity Through Organizational Learning in the Singapore Construction Industry, ” Int. J. Constr. Proj. Manag., Vol. 8, no. 1, pp. 71–89, 2016. [Google Scholar]
  37. M. R. Abdul Kadir, W. P. Lee, M. S. Jaafar, S. M. Sapuan, and A. A. A. Ali, “Factors affecting construction labour productivity for Malaysian residential projects, ” Struct. Surv., Vol. 23, no. 1, pp. 42–54, 2005. [CrossRef] [Google Scholar]
  38. S. Dixit, S. N. Mandal, A. Sawhney, and S. Singh, “Relationship between skill development and productivity in construction sector: A literature review, ” Int. J. Civ. Eng. Technol., Vol. 8, no. 8, 2017. [Google Scholar]
  39. E. A. Poirier, S. Staub-French, and D. Forgues, “Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research, ” Autom. Constr., Vol. 58, pp. 74–84, 2015. [CrossRef] [Google Scholar]
  40. X. Li, G. Q. Shen, P. Wu, H. Fan, H. Wu, and Y. Teng, “RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production, ” J. Manag. Eng., Vol. 34, no. 2, p. 04017053, 2017. [CrossRef] [Google Scholar]
  41. S. Pheng Low, “Quantifying the relationships between buildability, structural quality and productivity in construction, ” Struct. Surv., Vol. 19, no. 2, pp. 106–112, 2001. [CrossRef] [Google Scholar]
  42. S. Durdyev and J. Mbachu, “On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures, ” Australas. J. Constr. Econ. Build., Vol. 11, no. 3, pp. 18–33, 2011. [Google Scholar]
  43. R. Fulford and C. Standing, “Construction industry productivity and the potential for collaborative practice, ” Int. J. Proj. Manag., Vol. 32, no. 2, pp. 315–326, 2014. [CrossRef] [Google Scholar]
  44. S. Dixit and K. Sharma, “Factors Influencing Construction Time Delay on High Rise Projects In India, ” in Creative Construction Conference 2019, 2019, pp. 341–346. [Google Scholar]
  45. S. Dixit and K. Sharma, “Approaches to improve the quality of workplace Built Environment, ” 2019. [Google Scholar]
  46. S. Singh, S. Dixit, K. Kumar, and K. Sharma, “Science Direct An Introduction to Lean Construction / Visual Management tool in Construction Projects, ” Vol. 00, no. May, pp. 1–10, 2019. [Google Scholar]
  47. S. Dixit and K. Sharma, “A Review of Studies in Structural Health Monitoring (SHM), ” 2019, pp. 95–99. [Google Scholar]
  48. S. Dixit, “Science Direct Analyzing the Impact of Construction Productivity over Infra Projects: Indian Scenario, ” Vol. 00, no. May, 2019. [Google Scholar]
  49. M. N. Shah, S. Dixit, R. Kumar, R. Jain, and K. Anand, “Causes of delays in slum reconstruction projects in India, ” Int. J. Constr. Manag., pp. 1–16, Jan. 2019. [Google Scholar]
  50. S. Dixit and K. Saurabh, “Impact of Construction Productivity Attributes Over Construction Project Performance in Indian Construction Projects, ” Period. Polytech. Archit., Apr. 2019. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.