Open Access
Issue |
E3S Web Conf.
Volume 164, 2020
Topical Problems of Green Architecture, Civil and Environmental Engineering 2019 (TPACEE 2019)
|
|
---|---|---|
Article Number | 10014 | |
Number of page(s) | 9 | |
Section | Environmental Planning and Management | |
DOI | https://doi.org/10.1051/e3sconf/202016410014 | |
Published online | 05 May 2020 |
- H. Aladposh, “Guide to the project management body of knowledge.3rd Edition” (2004). [Google Scholar]
- E.S.I. Virginia, I. Arlington, VA. Pritchard, “Risk Management Concepts and Guidance” (2001) [Google Scholar]
- Khazaei, A. Abbas, Risk Management Basis for Risk Management in BOT Projects, 4th National Conference on Industrial Engineering (2003), [Google Scholar]
- D. E. Per T. Søren, K. Jørgen, H. V. Trine, Palaeogeography, Palaeoclimatology, Palaeoecologyp, 217–237 (2014). DOI:10.1016/j.tust.2004.01.001. [Google Scholar]
- H. Marcel, B. Stuart, L.S. Pau, W. Eddy, Research on Best Practices and Lessons Learnt in Large Infrastructure Projects in Europe (2008). [Google Scholar]
- H. Wagner, International Symposium on Underground Excavation and Tunneling (2006). [Google Scholar]
- L. Carl, “Risk Management Concepts and Guidance” (2001) [Google Scholar]
- Garshab, A. Abbas, Risk Management Basis for Risk Management in BOT Projects, 4th National Conference on Industrial Engineering (2003), [Google Scholar]
- B.G. Glaser, International Journal of Qualitative Methods 1(2), 23–83 (2002). [Google Scholar]
- R. William, “PMBOK® Guide – Sixth Edition” (2017). [Google Scholar]
- Yogaranpan, M, Yoga,Water Technologies Pty. Ltd. Australia, 499-508 (1996). [Google Scholar]
- GA. Khouty, International Tunnel and Tunneling 35(2) (2005). [Google Scholar]
- B. Li, A. Akintoye, P.J. Edwards, C. Hardcastle, International Journal of Project Management 23(1), 25 – 53 (2005) [CrossRef] [Google Scholar]
- Abbasnia, Reza, M.S. Wahid “Identification of Critical Risk Assessment and Management of Joint Construction Projects” (2011). [Google Scholar]
- A. Kazemi, Kamyar, “Investigating Contractors’ Problems and Extending Project Execution Time”(2009). [Google Scholar]
- M. Mousavi, Hasan, “Quantitative Study of Delays in National Development Projects” (2009). [Google Scholar]
- E.P. Mazob, E.E. Pakhamov, M.G. Belova, “Organization of construction production”, 60 (2006). [Google Scholar]
- P.P. Olienik, “Construction organization production”, 576 (2010). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.