Open Access
Issue |
E3S Web Conf.
Volume 165, 2020
2020 2nd International Conference on Civil Architecture and Energy Science (CAES 2020)
|
|
---|---|---|
Article Number | 04020 | |
Number of page(s) | 4 | |
Section | Civil, Architectural Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202016504020 | |
Published online | 01 May 2020 |
- Chen Kang. Research on winter construction technology of mass concrete for base plate of high-rise building [J]. Sichuan Cement, 2019 (08): 289. [Google Scholar]
- Han Xu. Research on construction technology of large-scale concrete in foundation engineering [J]. Journal of Shandong Agricultural Engineering College, 2019, 36 (02): 40-41. [Google Scholar]
- Zeng Yizhuo. Construction technology of mass concrete for base plate of high-rise building [J]. Low Carbon World, 2018 (07): 184-185. [Google Scholar]
- Tian Weiguo, Ling Huyan, Guan Congcong, Shao Peng, Hong Zhi. Construction technology of high-strength volume concrete in Block C of Hefei Evergrande Center [J]. Construction Technology, 2017, 46 (24): 1-7. [Google Scholar]
- Ouyang Tingji. Discussion on the problems and preventive measures of water pouring in the floor concrete pouring in the deep foundation pit [J]. Fujian Building Materials, 2016 (08): 104-105. [Google Scholar]
- Shao Yuancai. Research on construction supervision of mass concrete for base plate of high-rise building [J]. Building Materials and Decoration, 2016 (34): 168-169. [Google Scholar]
- Zhu Yimin, Gong Jian. Mass concrete construction technology for the base floor of the main building of Ningbo Global Shipping Plaza [J]. Construction and Construction, 2012,34(01):4-7. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.