Open Access
Issue
E3S Web Conf.
Volume 165, 2020
2020 2nd International Conference on Civil Architecture and Energy Science (CAES 2020)
Article Number 06058
Number of page(s) 5
Section Electrical and Power Engineering
DOI https://doi.org/10.1051/e3sconf/202016506058
Published online 01 May 2020
  1. Chen Wei, Qi Yingxia. Research progress and performance analysis on HCFCs alternative refrigerants. Chinese Journal of Refrigeration Technology, 39(12) 41-33; (2011) [Google Scholar]
  2. The “Boustead Model”, Life cycle analysis software, http://www.bousteadconsulting.co.uk/ [Google Scholar]
  3. Life Cycle Inventory Analysis of a Generic Vehicle, prepared by Ecobalance and University of Michigan, National Pollution Prevention Center for USAMP (U.S. Automotive Materials Partnership)(1998) [Google Scholar]
  4. Mc Culloch A, Lindley A.A. From mine to refrigeration: a life cycle inventory analysis of the production of HFC-134a[J]. International journal of refrigeration, 26(8): 865-872(2003) [Google Scholar]
  5. Krieger, T.M.; Bateman, D.J.; Sylvester, R.W. Life Cycle Analysis for Production of HFC-134a and HFC-152a[R]. MAC Summit. Washington DC (2004). [Google Scholar]
  6. Johnson, C.R. 744 as an Adjustment to GWP[R]. MAC Summit, Washington DC, (2004). [Google Scholar]
  7. Zuo Xiaolong. Green Tax Theory and the Construction of China's Green Tax System [D]. Baoding: Hebei University(2010). [Google Scholar]
  8. Pang Pai. Current Situation Analysis and Reform Path of the Green Tax in China's Automobile Consumption Link [J]. Journal of Liaoning University of Technology (Social Science Edition), Issue 15:35-36(2019) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.