Open Access
Issue |
E3S Web Conf.
Volume 178, 2020
High Speed Turbomachines and Electrical Drives Conference 2020 (HSTED-2020)
|
|
---|---|---|
Article Number | 01046 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/202017801046 | |
Published online | 09 July 2020 |
- Liqiang An, Yongyu Guan, Zhijian Zhu, Jiong Wu, Ronglun Zhang, Engineering Failure Analysis 104, 911-931 (2019). [Google Scholar]
- Guohong Chen, Xu Wang, Jiaqing Wang, Jun-jian Liu, Wenming Tang, Engineering Failure Analysis 19, 13-21 (2012). [Google Scholar]
- S. Karabay, F. Kaya Önder, Electric Power Systems Research 72, 21, 179-185 (2004). [CrossRef] [Google Scholar]
- S. Karabay, Materials and Design 30, 3, 816-825 (2009). [CrossRef] [Google Scholar]
- R.B. Kalombo, J.M.G. Martínez, J.L.A. Ferreira, C.R.M. da Silva, J.A. Araújo, Procedia Engineering 133, 223-232 (2015). [Google Scholar]
- N. Fedorov, Overhead lines 1, 6, 31-34 (2012). [Google Scholar]
- STO 56947007, Norms of technological design of overhead power transmission lines with a voltage of 35-750 kV (2014). [Google Scholar]
- Rules of Electrical Installations Design, Russian Electrical Code, 7th Edition, All sections and exhibits, Saint-Petersburg, 928 (2000). [Google Scholar]
- R.C.R. de Mendez, J.D. Riera, L.F.F. Miguel, J. KaminskiJr, L.F.F. Miguel, J.B.G. Ferreira da Silva, On Modeling the Dynamic Response of the 190m-high Tower for the Crossing of Trombetas River in the Amazon Region, CIGRE Session, B2-212 (2012). [Google Scholar]
- B. Subba Reddy, Diptendu Chatterjee, Energy Procedia 90, 179-184 (2016). [CrossRef] [Google Scholar]
- G.S. Rashmi, Shivashankar, Poornima, Materials Today: Proceedings 4, 10, 11318-11324 (2017). [CrossRef] [Google Scholar]
- C.R.F Azevedo, T. Cescon, Engineering Failure Analysis 9, 6, 645-664 (2002). [Google Scholar]
- I. Levchenko, A. Zasypkin, A. Alliluyev, E. Satsuk (Moscow: Publishing House of Mos-cow Power Engineering Institute, 447, 2007). [Google Scholar]
- V. Kachanovskaya, M. Yermoshina, Electricity, Transmission and distribution 1, 16, 50-54 (2013). [Google Scholar]
- V. Kachanovskaya, M. Yermoshina, Transmis-sion and Distribution World, USA, 52-54 (2013). [Google Scholar]
- A. Boshnyakovich, Calculation of substation wires and large overhead power line crossings (Leningrad: Energy, 236, 1975). [Google Scholar]
- M. Korotkevich, N. Prokofiev, Power engineering, Energetika, Proceedings of CIS higher edu-cation institutions and power engineering associations 61, 5, 432-439 (2018). [CrossRef] [Google Scholar]
- G. Ugarov, N. Shevchenko, Yu. Lebedeva, A. Soshinov (Moscow: Pero, 186, 2013). [Google Scholar]
- Yu. Lebedeva, N. Shevchenko, A. Soshinov, Modern problems of science and education 6, 68-71 (2010). [Google Scholar]
- N. Shevchenko, Izvestiya VolgGTU, Series: Energy Conversion Processes and Power Plants 8, 3, 89-92 (2011). [Google Scholar]
- N. Shevchenko, Yu. Lebedeva, G. Ugarov, Vestnik SGTU 1, 3, 121-125 (2011). [Google Scholar]
- N. Shevchenko, Abstract of the dis. Cand. Technical Sciences 05.09.03 (Saratov, 20, 2011). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.