Open Access
Issue |
E3S Web Conf.
Volume 185, 2020
2020 International Conference on Energy, Environment and Bioengineering (ICEEB 2020)
|
|
---|---|---|
Article Number | 01028 | |
Number of page(s) | 5 | |
Section | Energy Engineering and Power System | |
DOI | https://doi.org/10.1051/e3sconf/202018501028 | |
Published online | 01 September 2020 |
- Tong Zhiqiang. (2016) Research on Related Issues of Implementing Electricity Substitution in Hebei Southern Power Grid.D. North China Electric Power University. [Google Scholar]
- He Xiqing, Wang Zhouxuan, Li Xiaojiang, et al. (2012) Electric heating water source heat pump and other heating systems’ operation effectanalysis. J. Power demand side management, 14(3):28–32. [Google Scholar]
- Zhang Jian, Wu Liang, Yuan Xinrun, et al. (2015) Application analysis of decentralized electric heating in Tianjin. J. Power demand side management, 17(6): 33–36. [Google Scholar]
- Lin Kunping, Zhang Yinping, Di Hongfa, et al. (2004) Thermal performance of shaped phase change material heat storage floor electric heating system. J. Journal of Tsinghua University (Natural Science Edition),44(12):1618–1621. [Google Scholar]
- Li Xingwen, Chen Degui. (2007) Magnetohydrodynamics of air switch arcSimulation and characteristic simulation. J. Chinese Society for Electrical Engineering, 27(21): 31–37. [Google Scholar]
- Li Xingwen, Chen Degui. (2007) Research overview of mathematical model and characteristics of air switch arc. J. High voltage electrical appliances, 43(4): 269–273. [Google Scholar]
- Liu Yanru, Yang Weihong, Wang Ji, et al. (2017) Load characteristic analysis of rural power grid before and after the “Coal to Electricity” Project. J. Electrical Technology,18(4):110–115. [Google Scholar]
- Gao Ze, Chen Dengming, Yang Jianhua, et al. (2015) Grid planning research of rural low-voltage distribution considering”Coal to Electricity” Project. J. Electricians Electric (5):1–5. [Google Scholar]
- Yuan Xinrun, Wu Liang, Zhang Jian, et al. (2015) Tianjin’s electricity replacement situation and electricity heating experience economic analysis. J. Power demand side management,17(5):24–29. [Google Scholar]
- Meng Yi. (2010) Influence of Electric Heating on Construction and Operation of Heilongjiang Power Grid. J. Heilongjiang Power,32(2):149–150. [Google Scholar]
- Xiong Jian, Li Yiyan, Liu Lihui, et al. (2013) Xinjiang Electric Heating Market Status. J. Xinjiang Electric Power Technology (2):69–70. [Google Scholar]
- He Huimin, Wang Haiyan, Ren Jie, et al. (2016) Feasibility Study of Using Wind Power to Abandon Wind Power to Replace Electricity with Winter Heating. J. North China Electric Power Technology, (1): 1–5. [Google Scholar]
- Lv Quan, Jiang Hao, Chen Tianyou, et al. (2014) Based Thermal Power Plant Wind Turbine Consumption Plan and Its National Economic Evaluation. J. Automation of Electric Power Systems, 38(1): 6–12. [Google Scholar]
- Wang Kai. (2016) Prospects for Xinjiang Wind, Solar and Storage Complementary Power Generation. J. Shanghai Electric Technology, 9(4): 26–28. [Google Scholar]
- Ma Guidong, Ma Liya, Ma Xiaodong, et al. (2016) Feasibility analysis of large-scale heating of clean energy such as wind power in Changji, Xinjiang. J. Heating and cooling (9): 24, 26. [Google Scholar]
- Gong Zhenqing, Li Dongdong. (2011) Study on heating mode of wind power in wind power enrichment area. J. China Electric Power Education (30): 97, 99. [Google Scholar]
- Wu Gonggao, Ye Zhongxiong, Yaoming, et al. (2011) Analysis and Research on Anhui Power Grid’s Ability to Accept Wind Power. J. East China Power, 39(6): 97–99. [Google Scholar]
- MILLIGAN M. (2003) Wind Power Plants and System Operation in the Hourly Time Domain. In. AWEA Wind Power Conference, Austin Texas, May 18–21. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.