Open Access
Issue
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
Article Number 03025
Number of page(s) 5
Section Exploration and Innovation of Construction Engineering Technology
DOI https://doi.org/10.1051/e3sconf/202019803025
Published online 26 October 2020
  1. Gu L.S., Wang D.B., Ma X.L,. J. Waterway Harbor, 37,3(2016) [Google Scholar]
  2. Lin G.J., Wan Z.G., Deng L.F., J. Waterway Harbor, 39,6(2018) [Google Scholar]
  3. Lei H. Y., Lu H. B., Liu J.J., et al., Int. J. Geom., 17,12(2017) [Google Scholar]
  4. Wang J., Cai Y.Q., Fu H.T, et al., Chinese J. Rock Mech. Eng. 33,6(2014) [Google Scholar]
  5. POTHIRAKSANON C., DENNES T.B., ABUEL-NAGA H. M., Soils Foundations 50,5(2010) [Google Scholar]
  6. Tao H.B., Xie K.H., Liu G.B., Huang D.Z., Deng Y.B., Rock Soil Mech. 34,S1(2013) [Google Scholar]
  7. Yin T.F., Liu G.B., Guo Z., Building Struc. 8(2014). [Google Scholar]
  8. Liu G.B., Fan G.F., Tao H.B., Yin T.F., Deng Y.B., J. C.S. Univ.(Sci. Tech) 28, 2(2017) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.