Open Access
Issue
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
Article Number 03027
Number of page(s) 4
Section Exploration and Innovation of Construction Engineering Technology
DOI https://doi.org/10.1051/e3sconf/202019803027
Published online 26 October 2020
  1. He Ju, Qin Yang. Study on the Application of BIM in the Construction Management of Electric Power Engineering [J].]1 Technology and Enterprise ,2015(1):63-65. [Google Scholar]
  2. Xu Deguang. Application of BIM technology in substation construction. [D]. North China University of Water Conservancy and Hydropower ,2017:13-14. [Google Scholar]
  3. EASTMAN C ,TEICHOLZ P ,SACKS R ,et al.BIM handbook 2th edition [M]. New Jersey: John Wiley &Sons ,2010: 2-29. [Google Scholar]
  4. ZANEN P P A ,HA R TMANN T ,AL-JIBOURI S H S ,et al .Using 4D CAD to visualize the impacts of highway construction on the public [J]. Automation in Construction ,2013,32(1): 136-144. [CrossRef] [Google Scholar]
  5. GE Bin, Shao Songtao, Shi Min. Application of 3D Design in Substation Engineering [j].1 Applied Energy Technology ,2018,11:50-54. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.