Open Access
Issue |
E3S Web Conf.
Volume 202, 2020
The 5th International Conference on Energy, Environmental and Information System (ICENIS 2020)
|
|
---|---|---|
Article Number | 02012 | |
Number of page(s) | 7 | |
Section | Environmental Technology and Conservation | |
DOI | https://doi.org/10.1051/e3sconf/202020202012 | |
Published online | 10 November 2020 |
- X. Li, P. Wu, X. Wang, and Y. Teng, “Automation in Construction Mapping the knowledge domains of Building Information Modeling ( BIM ): A bibliometric approach,” Autom. Constr., vol. 84, no. July, pp. 195–206, (2017). [CrossRef] [Google Scholar]
- Y. Lu, Z. Wu, R. Chang, and Y. Li, “Automation in Construction Building Information Modeling ( BIM ) for green buildings : A critical review and future directions,” Autom. Constr., vol. 83, no. February, pp. 134–148, (2017). [CrossRef] [Google Scholar]
- M. N. Sholeh, A. Nurdiana, B. Setiabudi, and Suharjono, “Identification of Potential Uses of Building Information Modeling (BIM) for Construction Supply Chain Management : Preliminary Studies,” IOP Conf. Ser. Earth Environ. Sci., vol. 448, (2020). [Google Scholar]
- L. P. Luong, C. Amin, and D. Thien-my, “BIM contributions to construction supply chain management trends : an exploratory study in Canada,” Int. J. Constr. Manag., pp. 1–19, (2019). [Google Scholar]
- J. Irizarry, E. P. Karan, and F. Jalaei, “Integrating BIM and GIS to improve the visual monitoring of construction supply chain management,” Autom. Constr., vol. 31, pp. 241–254, (2013). [CrossRef] [Google Scholar]
- E. P. Karan, J. Irizarry, and J. Haymaker, “BIM and GIS Integration and Interoperability Based on Semantic Web Technology,” J. Comput. Civ. Eng., vol. 30, no. 3, p. 04015043, (2016). [CrossRef] [Google Scholar]
- X. Liu, X. Wang, G. Wright, J. C. P. Cheng, X. Li, and R. Liu, “A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS),” ISPRS Int. J. Geo-Information, vol. 6, no. 2, p. 53, (2017). [CrossRef] [Google Scholar]
- S. L. Chan and M. Park, “Project cost estimation using principal component regression,” Constr. Manag. Econ., vol. 23, no. 3, (2005). [Google Scholar]
- M. M. Tahir, N. A. Haron, A. H. Alias, A. N. Harun, and I. B. Muhammad, “Improving Cost and Time Control in Construction Using Building Information Model (BIM): A Review,” Pertanika J. Sci. Technol., vol. 26, no. 1, (2018). [Google Scholar]
- M. A. Wibowo, N. U. Handayani, A. Nurdiana, and M. N. Sholeh, “The identification of waste construction at construction project life cycle,” Adv. Sci. Lett., vol. 23, no. 3, pp. 2633–2635, (2017). [Google Scholar]
- I. Mahamid, “Risk matrix for factors affecting time delay in road construction projects: owners’ perspective,” Eng. Constr. Archit. Manag., vol. 18, no. 6, pp. 609–617, (2011). [CrossRef] [Google Scholar]
- P. F. Kaming, P. O. Olomolaiye, G. D. Holt, and F. C. Harris, “Factors influencing construction time and cost overruns on high-rise projects in Indonesia,” Constr. Manag. Econ., vol. 15, no. 1, pp. 83–94, (1997). [CrossRef] [Google Scholar]
- N. N. K. N. M. A. Azman, A. C. Ahmad, M. M. Derus, and I. F. M. Kamar, “Determination of Direct to Indirect Accident Cost Ratio for Railway Construction Project,” MATEC Web Conf., vol. 266, (2019). [Google Scholar]
- D. F. Heathfield, An introduction to cost and production functions. Macmillan International Higher Education, (2016). [Google Scholar]
- M. Brook, Estimating and tendering for construction work. Taylor & Francis, (2016). [CrossRef] [Google Scholar]
- R. Aird, “The case for specialist training for learning support assistants employed in schools for children with severe, profound and multiple learning difficulties,” Support Learn., vol. 15, no. 3, pp. 106–110, (2000). [CrossRef] [Google Scholar]
- M. R. Hallowell and J. A. Gambatese, “Qualitative Research : Application of the Delphi Method to CEM Research,” vol. 136, no. 1, pp. 99–107, (2010). [Google Scholar]
- S. Isaac, M. Curreli, and Y. Stoliar, “Work packaging with BIM.,” Autom. Constr., vol. 83, pp. 121–133, (2017). [CrossRef] [Google Scholar]
- R. Jin, C. M. Hancock, L. Tang, and D. Wanatowski, “BIM Investment, Returns, and Risks in China’s AEC Industries,” J. Constr. Eng. Manag., vol. 143, no. 12, p. 04017089, (2017). [Google Scholar]
- R. Deutsch, BIM and integrated design: strategies for architectural practice. John Wiley & Sons, (2011). [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.