Open Access
Issue
E3S Web Conf.
Volume 325, 2021
ICST 2021 – The 2nd Geoscience and Environmental Management Symposium
Article Number 01016
Number of page(s) 6
Section Disaster Risk Reduction
DOI https://doi.org/10.1051/e3sconf/202132501016
Published online 17 November 2021
  1. Anonym. Laporan Akhir Detail Engineering Design (DED) Rababaka Komplek Kabupaten Dompu Nusa Tenggara Barat. Mataram. PT. Indra Karya (2018) [Google Scholar]
  2. A. Sudradjat, N. Suwarna, Mangga, S. Andi, Peta geologi lembar Sumbawa, Nusa Tenggara Geological map of the Sumbawa Quadrangle, Nusa Tenggara (1998) [Google Scholar]
  3. C. I. Abdullah, N. A. Magetsari, H. S. Purwanto, J. Math. Fundam. Sci. ITB, 35(2), doi:10.5614 (2003) [Google Scholar]
  4. D. C. Wyllie & C. W. Mah, Rock slope engineering : civil and mining (New York 2004) [Google Scholar]
  5. Z. T. Bieniawski, Engineering Rock Mass Classification A Complete Manual for Engineers and Geologist in Mining, Civil and Petroleum Engineering (John. Wiley & Sons, NewYork 1989) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.