Open Access
Issue
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
Article Number 01015
Number of page(s) 4
Section Development, Utilization and Protection of Traditional Energy Resources
DOI https://doi.org/10.1051/e3sconf/202123601015
Published online 09 February 2021
  1. Wu Rong. Research on Wuhai Distribution Network Planning Scheme[D]. North China Electric Power University, 2018. [Google Scholar]
  2. Liao Junjie. Research on Pingnan County Distribution Network Planning [D]. Guangxi University, 2016. [Google Scholar]
  3. Xie Wei, Pan Wenming, Wang Chenghua, Chen Li, Wang Yang, Ma Jing, Li Zhiwei, Du Haihong. Research on the medium and long-term investment scale prediction model of provincial power grid based on support vector machine[J]. Industrial Technology Economy, 2019, 38 (08):154-160. [Google Scholar]
  4. Ji Liwei, Yang Liping, Fei Gaiying. Analysis and prediction of influencing factors of power grid project investment [J]. China Electric Power Enterprise Management, 2016(06): 85-92. [Google Scholar]
  5. Hu Baichu, Hu Gang, Hu Chaohua, Qing Song, Li Mingwei, Peng Chao. Power grid infrastructure investment calculation model based on gray prediction[J]. Journal of University of Electronic Science and Technology of China, 2013, 42(06): 890-894 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.