Open Access
Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 01045 | |
Number of page(s) | 5 | |
Section | Development, Utilization and Protection of Traditional Energy Resources | |
DOI | https://doi.org/10.1051/e3sconf/202123601045 | |
Published online | 09 February 2021 |
- Wu, M, Q. (2018) Study on Influencing Factors and Prediction Model of Equipment and Material Price in Power Grid Engineering. North China Electric Power University. [Google Scholar]
- Lu, Y. (2016) Research on Dynamic Management Model of Power Grid Project Cost Based on Target Control. North China Electric Power University. [Google Scholar]
- Yu, C. (2016) Study on the Influencing Factors and Evaluation Model of Power Grid Project Cost. North China Electric Power University. [Google Scholar]
- Liu, X. (2017) Research on Cost Control Evaluation of Power Grid Project of Tianjin Electric Power Company. Tianjin University. [Google Scholar]
- Wu, D. (2019) Research on Application of Theory and Method Model of Transmission and Distribution Project Cost Analysis. Experience Exchange. [Google Scholar]
- Zhao, G, Z. (2019) Influence of Material Price Change on Project Cost and Control Strategy. Hot Spot Perspective. [Google Scholar]
- He, L. (2017) Study on the Influence of Building Material Price Fluctuation on Construction Cost. Zhengzhou University. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.