Open Access
Issue
E3S Web Conf.
Volume 245, 2021
2021 5th International Conference on Advances in Energy, Environment and Chemical Science (AEECS 2021)
Article Number 01001
Number of page(s) 4
Section Energy Development and Utilization and Energy-Saving Technology Application
DOI https://doi.org/10.1051/e3sconf/202124501001
Published online 24 March 2021
  1. Zhang Jin. Research on the Early Stage Cost Management Evaluation System of BJ Company Power Grid Construction Project[D]. Xi'an University of Science and Technology, 2019. [Google Scholar]
  2. Liu Hongzhi, Tu Qingbo, Gao Jingren, Li Yan. Research on the application mode of power grid project cost management based on BIM technology[J]. Shaanxi Electric Power, 2016, 44(11): 66–71. [Google Scholar]
  3. Wang Quan, Zhang Yufeng. Analysis of the application of building information modeling (BIM) in power engineering cost[J]. Journal of Wuhan University (Engineering Edition), 2018, 51(S1): 380–386. [Google Scholar]
  4. Ke Zihuan, Gao Laixian. Research on the application of BIM technology in the construction of power grid projects [J]. China Standardization, 2019(14): 70–72.4. Conclusion [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.