Open Access
Issue
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
Article Number 09039
Number of page(s) 10
Section Energy Efficiency in Construction
DOI https://doi.org/10.1051/e3sconf/202125809039
Published online 20 May 2021
  1. I.S. Karasev, L.A. Oparina, Development of proposals for an action plan for the implementation of BIM technologies as a factor in the development of the Smart City concept, Young scientists - for the development of the National Technology Initiative (POISK-2020): collection of proceedings of the All-Russian (with international participation) youth scientific and technical conference. - Ivanovo: IVGPU 814, 270-273 (2020) [Google Scholar]
  2. L.A. Oparina, A systematic approach to organizing the life cycle of energy-efficient buildings, Housing construction 8, 12-15 (2014) [Google Scholar]
  3. Lianying Zhang, Xiang Zhang, Teng Ma, Management of Construction Schedules Based on Building Information Modeling Technology, Emerging Technologies for Information Systems, Computing, and Management, 81-88 (2013) [Google Scholar]
  4. Cormen, H. Thomas, Leiserson, E. Charles, Rivest, L. Ronald, Stein Clifford, Introduction to Algorithms (2nd Edition. Transl. from English, Williams Publishing house, M., 2010) [Google Scholar]
  5. M. Bilec, R. Ries, Scott Matthews H., Life-Cycle Assessment Modeling of Construction Processes for Buildings, Journal of Infrastructure Systems 16(3), 199-205 (2010) [Google Scholar]
  6. Mohamed Moussa, Y. Janaka, Ruwanpura, George Jergeas, and Tamer Mohamed. Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria, Journal of Construction Engineering, 12 (2014) [Google Scholar]
  7. Zdzislaw Hejducki, Scheduling model of construction activity with time couplings, Journal of Civil Engineering and Management 9(4) 284-291 (2003) [CrossRef] [Google Scholar]
  8. Sławomir Biruk, Piotr Jaśkowski, Agata Czarnigowska, Updating Linear Schedules with Lowest Cost: a Linear Programming Model, IOP Conf. Series: Materials Science and Engineering, 245 (2017) [Google Scholar]
  9. Hojjat Adeli, Asim Karim, Construction scheduling, cost optimization, and management (Taylor & Francis e-Library, 2005) [Google Scholar]
  10. Qian Li, Sha Tao, Heap-Yih Chong, Zhijie Sasha Dong Robust, Optimization for Integrated Construction Scheduling and Multiscale Resource Allocation, Hindawi Complexity, 1-17 (2018) [Google Scholar]
  11. S. Biruk, J. Jaskowski. Scheduling Linear Construction Projects with Constraints on Resource Availability, Archives of Civil Engineering 63(1), 3-15 (2017) [Google Scholar]
  12. A.A. Volkova, F.K. Klashanov, P.B. Kagan, Digitalization in the management of information flows in construction. Construction systems engineering. Cyber-physical building systems – 2019, Collection of proceedings of the All-Russian scientific and practical conference, 81-85 (2019) [Google Scholar]
  13. A.A. Morozenko, D.V. Krasovsky, Eliminating the shortcomings of scheduling and network planning by applying the matrix of key project events, Vestnik MGSU 12(6) (105), 674-679 (2017) [Google Scholar]
  14. I.I. Mazur, V.D. Shapiro, N.G. Olderogge, Project management (Under the general edition of I.I. Mazur, 2nd ed., Omega-L, M., 2004) [Google Scholar]
  15. V.S. Volkov, V.A. Yezhova, Game theory, Innovative technologies in science and education: collection of articles of the XII International scientific and practical conference, 155-158 (2019) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.