Open Access
Issue |
E3S Web Conf.
Volume 261, 2021
2021 7th International Conference on Energy Materials and Environment Engineering (ICEMEE 2021)
|
|
---|---|---|
Article Number | 02021 | |
Number of page(s) | 7 | |
Section | Energy Chemistry Performance and Material Structure Analysis | |
DOI | https://doi.org/10.1051/e3sconf/202126102021 | |
Published online | 21 May 2021 |
- J. Zhang, W. Xie. Status of Scientific Drilling Technology for Ultra-Deep Well. Acta Geologica Sinica, 84, 887-894 (2010). [Google Scholar]
- H. Wang, X. Zheng. Status quo and faced challenges of deep well drilling technique of PetroChina. Petroleum Drilling and Production Technology, 27, 4-8 (2005). [Google Scholar]
- Y. Zha, S. Hu, L. Zhuo, et al. Research on the application prospects of Titanium alloy petroleum pipes. Drilling Technology, 40, 1-3 (2017). [Google Scholar]
- R. Schutz, H. Warkins. Recent developments in titanium alloy application in the energy industry. Materials Science and Engineering: A, 243, 305-315 (1998). [Google Scholar]
- R. Snyder. Titanium Drill Pipe. World Oil, 220, 23 (1999). [Google Scholar]
- J. Smith, R. Chandler, P. Boster. Titanium drill pipe for ultra-deep and deep directional drilling. SPE/IADC Drilling Conference. Society of Petroleum Engineering, (2001). [Google Scholar]
- S. Waqar, S. Asad, S. Ahmad, et al. Effect of Drilling parameters on hole quality of Ti-6AL-4V Titanium Alloy in Dry Drilling. Materials Science Forum. Trans Tech Publications, 880, 33-36 (2017). [Google Scholar]
- P. Zhao, The latest development of domestic and foreign drill pipe technology. World Steel, 8, 22-27 (2008). [Google Scholar]
- W. Yuan, Q. Zhang. Research progress of titanium alloy drill pipes abroad. Xinjiang Petroleum Science and Technology, 16, 13-15 (2006). [Google Scholar]
- Y. Wang, C. Zhang, B. Zhang. Safety analysis of new type of titanium alloy and aluminum alloy drill pipe structure. Petroleum Field Machinery, 12, 3133 (2010). [Google Scholar]
- Q. Zhao, W. Zhao. Titanium alloy drill pipe for short radius drilling. Petroleum Machinery, 29, 5456 (2001). [Google Scholar]
- Z. Shen, H. Huang, D. Gao. New progress and development trend analysis of world drilling technology. Journal of China University of Petroleum (Edition of Natural Science), 4, 64-70 (2009). [Google Scholar]
- B. Wang. Research on manufacturing technology of high-strength drill pipe. Xi’an University of Science and Technology, (2014). [Google Scholar]
- GB/T 231.1-2009. Brinell hardness test of metallic materials. Part 1: Test method, (2009). [Google Scholar]
- GB/T 228-2002, Tensile test method for metal materials at room temperature, (2002). [Google Scholar]
- Z. Lian, S. Xu. Analysis of injection and production parameters of gas injection reservoir and critical buckling load of pipe string. Petroleum Drilling and Production Technology, 40, 131-136 (2018). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.