Open Access
Issue
E3S Web Conf.
Volume 261, 2021
2021 7th International Conference on Energy Materials and Environment Engineering (ICEMEE 2021)
Article Number 02071
Number of page(s) 6
Section Energy Chemistry Performance and Material Structure Analysis
DOI https://doi.org/10.1051/e3sconf/202126102071
Published online 21 May 2021
  1. Saggafmm. Avision for future up stream technologies[J]. Journal of Petroleum Technology, 2008, 60 (3) : 54-98 [Google Scholar]
  2. Cui Chuanzhi Xu Jianpeng, Wang Duanping, etal. A new water flooding characteristic curve atultra – high water cut stage [J]. ACTA Petroleum Inica, 2015, 36 (10): 1267-1271 [Google Scholar]
  3. Du Qinglong. Variation law and microscopic mechanis mofper meability insand stone reservoir during long – term water flooding development[J]. ACTA Petro leis Inica, 2016, 37 (9) : 1159-1164.[R] [Google Scholar]
  4. Ou Yang Liang biao Practical consider ation of an inflow control device application for reducing water production. SPE124154, 2009 [Google Scholar]
  5. Au GustineJr, Mciintyrea Adam, etal. Increasing oil recovery by preventing early waterand gas breakthrough in a west braehorizontal well: acase history [C]. SPE99718, 2006 [Google Scholar]
  6. Ebaif Daviesdr Gaerd Inerar, etal. Evaluation of added value in reservoir management by application of flow control within Telligent wells [J]. Petroleum Geoscience, 2008, 14 (2): 183-196 [Google Scholar]
  7. Suhui, Donghua Modeling of equalizer production system and smart well application infull – field studies[J]. Spere servoire Valuation & Engineering, 2009, 12 (2): 318-328 [Google Scholar]
  8. Sun Kai Guo Boyun Saputellil. Multinode intelligent well technology for active inflow control inhorizontal wells [J]. Spedeling & Completion, 2011, 26 (3): 386-395. [Google Scholar]
  9. Wang Qing, Liu Huiqing Zhang Hongling, etal. Anoptimization model of completion string swith inner – located nozzle in horizontal well scoupled with reservoirs [J]. ACTAPPetroleum Inica, 2011, 32 (2): 346-349 [Google Scholar]
  10. Yang Jinxian Li Haitao, Dong Shexia, etal. Horizontal well completion optimization with inflow control devices inbottom waterdrive gas reservoirs [J]. Drilling& ProductionTechnology, 2013, 36 (2): 45-47 [Google Scholar]
  11. Zhao Xu, Yao Zhiliang, Liu Huanle Technical research on well completion design with inflow control device (ICD) inhorizontalwells[J]. Oil Drilling&Production Technology, 2013, 35 (1): 23-27 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.