Open Access
Issue
E3S Web Conf.
Volume 261, 2021
2021 7th International Conference on Energy Materials and Environment Engineering (ICEMEE 2021)
Article Number 03004
Number of page(s) 5
Section Environmental Engineering Planning and Urban Facilities Construction
DOI https://doi.org/10.1051/e3sconf/202126103004
Published online 21 May 2021
  1. Li, Y.F., Tian, X.M., Liu, J. (2009) Application of constructed wetland to treatment of domestic sewage from residential area in northern region. J. China Water & Wastewater, 12 : 53–56. [Google Scholar]
  2. García, J., Rousseau, D., Caselles-Osorio, A., et al. (2007) Impact of Prior Physico-Chemical Treatment on the Clogging Process of Subsurface Flow Constructed Wetlands: Model-Based Evaluation. J. Water, Air, and Soil Pollution, 185 : 101–109. [Google Scholar]
  3. Platzer, C., Mauch, K. (1997) Soil clogging in vertical flow reedbeds-mechanisms, parameters, consequences and ...Solutions?. J. Water Science and Technology, 35 : 175–81. [Google Scholar]
  4. Huang, F.Q., Chen, D.S., Wu, J.M., et al. (2017) Optimization of configuration and process for effectively mitigating substrate clogging in integrated vertical-flow constructed wetland. J. China Water & Wastewater, 33 : 31–36. [Google Scholar]
  5. Tong, W., Zhu, W., Ruan, A.D. (2007) Primary study of clogging mechanisms of suhstrates in vertical flow constructed wetland. J. Hupo Kexue, 19 : 25–31. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.