Open Access
Issue
E3S Web Conf.
Volume 272, 2021
2021 International Conference on Environmental Pollution and Governance (ICEPG 2021)
Article Number 02006
Number of page(s) 6
Section Environmental Governance and Solid Waste Treatment and Resource Utilization
DOI https://doi.org/10.1051/e3sconf/202127202006
Published online 14 June 2021
  1. Baochun C. 2003 J. Journal of Civil Engineering Research Progress on calculation theory of concrete filled steel tubular arch bridge 12 47-57. [Google Scholar]
  2. Junping C B L. 2020 J. Journal of Transportation Engineering Summary of arch bridge construction and technology development in the world 020(001) 27-41. [Google Scholar]
  3. Al X R E. 2013 Bridge structure system (People’s Communications Press) [Google Scholar]
  4. Junping C B W J Z J L. 2017 J Journal of Civil Engineering Application status and Prospect of CFST arch bridge in China (6) 50-61. [Google Scholar]
  5. Liu D S. 2007 J Communications Standardization Parameter Study of Ultimate Capacity of Tied-arch Bridges [Google Scholar]
  6. Pellegrino C, Cupani G, Modena C. 2010 J Engineering Structures The effect of fatigue on the arrangement of hangers in tied arch bridges 32(4) 1140-7. [Google Scholar]
  7. Xiong H, Liu Z, Deng Y. 2008 J Engineering Journal of Wuhan University Analysis of influence of design parameters on mechanical characteristics of concrete-filled steel tubular tied arch bridges [Google Scholar]
  8. Minyuan H. 2011 J Journal of Central South University of forestry science and technology Reasonable form of CFST rigid frame tied arch bridge 31(002) 90-4. [Google Scholar]
  9. Chunfeng L, Xiuyong S, Zaishong J, et al. 2008 J World Bridge Research on structural system design parameters of steel tied arch bridge 64-7. [Google Scholar]
  10. Jianping S, Richen J, Yuezhen X. 2011 J Railway Engineering Study on structural stability design parameters of Railway Long Span tied arch bridge 12 26-8. [Google Scholar]
  11. Jian W, Qingsong M. 2011 J Bridge construction Influence of structural parameters on dynamic characteristics of through CFST Arch Bridge [Google Scholar]
  12. Zhenwei Z, Wei Z. 2018 J Chinese and foreign highways Parameter analysis and linear control of Feiyan CFST Tied Arch Bridge 038(6) 105-8. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.