Open Access
Issue |
E3S Web Conf.
Volume 274, 2021
2nd International Scientific Conference on Socio-Technical Construction and Civil Engineering (STCCE – 2021)
|
|
---|---|---|
Article Number | 05007 | |
Number of page(s) | 12 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/e3sconf/202127405007 | |
Published online | 18 June 2021 |
- A. Maqsoom, Z. Babar, I. Shaheen. Influence of Construction Risks on Cost Escalation of Highway-Related Projects: Exploring the Moderating Role of Social Sustainability Requirements, Iran J Sci Technol Trans Civ Eng. (2021). DOI: 10.1007/s40996-021-00601-2. [Google Scholar]
- Annamalaisami Cindrela Devi, Kuppuswamy Ananthanarayanan. Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects, ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering 7, Iss. 2 (2021). DOI: 10.1061/AJRUA6.0001132. [Google Scholar]
- Abdul Nabi Mohamad, El-adaway, Islam H. Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects, Journal of Management in Engineering 37, Iss. 4 (2021). DOI: 10.1061/(ASCE)ME.1943-5479.0000917. [Google Scholar]
- Vacanas Yiannis, Danezis Chris. An overview of the risk of delay in Cyprus construction industry, International Journal of Construction Management 21 Iss. 4, 369–381 (2018). DOI: 10.1080/15623599.2018.1541703. [Google Scholar]
- Panthi Kamalesh, Waller Lewis, Ahmed Syed M. Residential Construction Risk Management: Does It Happen in Real Life? Collaboration and Integration in Construction, Engineering, Management and Technology, 465–470 (2019). DOI: 10.1007/978-3-030-48465-1_77. [Google Scholar]
- O. Okudan, C. Budayan, I. Dikmen. A knowledge-based risk management tool for construction projects using case-based reasoning, Expert Systems with Applications 173, 114776 (2021). DOI: 10.1016/j.eswa.2021.114776. [CrossRef] [Google Scholar]
- Isah Muritala Adebayo, Byung-Soo Kim. Integrating Schedule Risk Analysis with MultiSkilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems, Appl. Sci. 11, (2), 650 (2021). DOI: 10.3390/app11020650. [CrossRef] [Google Scholar]
- Peter E.D. Love, Jane Matthews, Weili Fang. Reflections on the Risk and Uncertainty of Rework in Construction, Journal of Construction Engineering and Management 147 Iss. 4, (2021). DOI: 10.1061/(ASCE)CO.1943-7862.0002030. [Google Scholar]
- L. Jia, Q.K. Qian, F. Meijer, H. Visscher. Exploring key risks of energy retrofit of residential buildings in China with transaction cost considerations, Journal of Cleaner Production 293, 126099 (2021). DOI: 10.1016/j.jclepro.2021.126099. [CrossRef] [Google Scholar]
- B. Chaparov, A. Gospodinova, I. Fedoseev, M. Yudenko. Institutional risks impact on the growth potential of construction entrepreneurship organizations, IOP Conference Series: Materials Science and Engineering 951, (1), 012030 (2020). DOI: 10.1088/1757-899X/951/1/012030. [CrossRef] [Google Scholar]
- A.N. Asaul, S. Ivanov. Structure of transactional costs of business entities in construction, World Applied Sciences Journal, 23, (13), 80–83 (2013). DOI: 10.5829/idosi.wasj. 2013.23.pac.90017. [Google Scholar]
- Zhai Wujuan, Ding Jiyong, Ding Leijie. Investment Risk Grade Evaluation of New Town Construction PPP Projects: Perspective from Private Sector, Journal of Urban Planning and Development 147 Iss. 2, (2021). DOI: 10.1061/(ASCE)UP.1943-5444.0000665. [Google Scholar]
- A.N. Asaul, M. Voynarenko, L. Dzhulii, L. Skorobohata, O. Mykoliuk. The Latest Information Systems in the Enterprise Management and Trends in their Development, 9th International Conference on Advanced Computer Information Technologies, ACIT, 8779874, 409–412 (2019). DOI: 10.1109/ACITT.2019.8779874. [Google Scholar]
- A.N. Asaul, M.P. Voynarenko, L.V. Skorobogata. Transformation of business capitalization model within the knowledge economy, Actual Problems of Economics, 161 (11), 8–15 (2014). [Google Scholar]
- S.G. Oparin. The Problem of Exceeding the Cost of Construction and New Opportunities to Solve it at the Stage of Project Preparation, Materials Science Forum Submitted: 201804-30 931, 1122–1126 (2018). DOI: 10.4028/www.scientific.net/MSF.931.1122 [CrossRef] [Google Scholar]
- J. Rifkin. Biosphere Politics: A New Consciousness for a New Century. N.Y.: Crown Publishing Group XI, 388 (1991). [Google Scholar]
- A.N. Asaul, M.A. Asaul, P.B. Liulin, N.V. Chepachenko. Housing Construction in Russia: Trends and Medium-Range Forecasts, Studies on Russian Economic Development 30, (3), 313–318 (2019). DOI: 10.1134/S1075700719030055. [CrossRef] [Google Scholar]
- A.N. Asaul, M. Voynarenko, L. Yemchuk, L. Dzhulii. New realities of the enterprise management system information support: Economic and mathematical models and cloud technologies, Journal of Information Technology Management, 12 (3) (2020). DOI: 10.22059/JITM.2020.76293. [Google Scholar]
- J.C. Barnes. A Guide to Business Continuity Planning. John Wiley & Sons, Ltd. (2001). [Google Scholar]
- G.M. Zagidullina, A.I. Romanova, O.A. Kleshcheva, I.E. Faizullin, R.M. Ivanova. Peculiarities of housing construction development in the region, Middle East Journal of Scientific Research 16, (4), 490–495 (2013). DOI: 10.5829/idosi.mejsr.2013.16.04.11754. [Google Scholar]
- N.A. Polovnikova, N.V. Chepachenko, M.N. Yudenko. Study and evaluation of the competitiveness potential of the organizations in the construction industry, Materials Science Forum, MSF 931, 1178–1181 (2018). DOI: 10.4028/www.scientific.net/MSF.931.1178. [CrossRef] [Google Scholar]
- L. Selyutina, E. Pesotskaya, E. Rybnov, S. Sitdikov. Risk’s accounting when building a management system for innovative and investment processes in construction, E3S Web of Conferences 217, 11010 (2020). DOI: 10.1051/e3sconf/202021711010. [CrossRef] [EDP Sciences] [Google Scholar]
- N.J. Smith. Appraisal, Risk and Uncertainty (Construction Management Series). London: Thomas Telford Ltd, UK (2003). [Google Scholar]
- N. Smith, T. Merna, P. Jobling. Managing Risk: In Construction Projects. Oxford: John Wiley & Sons. 256 (2009). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.