Open Access
Issue |
E3S Web Conf.
Volume 274, 2021
2nd International Scientific Conference on Socio-Technical Construction and Civil Engineering (STCCE – 2021)
|
|
---|---|---|
Article Number | 06005 | |
Number of page(s) | 15 | |
Section | Construction Technology and Organization | |
DOI | https://doi.org/10.1051/e3sconf/202127406005 | |
Published online | 18 June 2021 |
- B. N. Porfiryev, A. A. Shirov, M. N. Uzyakov, M. S. Gusev, and I. N. Shokin, Stud. Russ. Econ. Dev., 31 (2020) DOI: 10.1134/S1075700720030132 [Google Scholar]
- SNiP 1.04.03-85 Normy prodolzhitel'nosti stroitel'stva i zadela v stroitel'stve predpriyatiy zdaniy i sooruzheniy chast' I 2019 [Building regulations 1.04.03-85 Standards for the construction time and foundation in the construction of enterprises, buildings and structures part one 2019] URL: sniprf.ru/razdel-1/1-04-03-85-part01-01 (Last accessed: 30.03.2021) [Google Scholar]
- A. N. Kozlov, Project Management, 44 (2018) URL: pmmagazine.ru/editions/1-44-2018/ (Last accessed: 30.03.2021) [Google Scholar]
- SP 131.13330.2012 Stroitel'naya klimatologiya aktualizirovannaya redaktsiya SNiP 23-01-99* [Code of rules 131.13330.2012 Construction climatology updated edition of Building regulations 23-01-99*] URL: sniprf.ru/sp131-13330-2012 (Last accessed: 30.03.2021) [Google Scholar]
- Rekomendatsii po opredeleniyu norm prodolzhitel'nosti stroitel'stva zdaniy i sooruzheniy, stroitel'stvo kotorykh osushchestvlyayetsya s privlecheniyem sredstv byudzheta goroda Moskvy [Recommendations for determining the construction time regulation of buildings and structures, the construction of which is carried out with the involvement of funds from the budget of the city of Moscow] URL: docs.cntd.ru/document/537930021 (Last accessed: 30.03.2021) [Google Scholar]
- D. A. Brady, P. Tzortzopoulos, J. Rooke, C. T. Formoso, A. Tezel, Eng. Constr. Archit. Manag., 25 (2018) DOI: 10.1108/ECAM-07-2017-0122 [Google Scholar]
- R. A. Ibragimov, E. V. Korolev, T. R. Deberdeev, V. V. Leksin, Struct. Concr. 20 (2019)DOI: 10.1002/suco.201800008 [Google Scholar]
- R. Edirisinghe, Eng. Constr. Archit. Manag., 26 (2019) DOI: 10.1108/ECAM-04-2017-0066 [Google Scholar]
- X. L. Gan, R. D. Chang, C. Langston, T. Wen, Eng. Constr. Archit. Manag., 26 (2019) DOI: 10.1108/ECAM-05-2018-0198 [Google Scholar]
- V. A. Malahov, Project Management, 45 (2018) URL: pmmagazine.ru/editions/2-45-2018/ (Last accessed: 30.03.2021) [Google Scholar]
- V. G. Ivanov, S. V. Barabanova, R. V. Shagieva, N. M. Chikisheva, A. N. Lunev, N. V. Volkova, K. R. Nabiullina, E. V. Spirina, Int. Rev. Manag. Mark. 6, (2016) [Google Scholar]
- N. Pugacheva, M. Badrutdinov, S. Kashina, L. Yarullina, R. Farah, T. Kirillova, A. Lunev, IOP Conf. Ser. Mater. Sci. Eng. (2020) DOI: 10.1088/1757-899X/960/2/022042 [Google Scholar]
- D. Imaykin, R. Ibragimov, IOP Conf. Ser. Mater. Sci. Eng. (2020) DOI: 10.1088/1757-899X/890/1/012126 [Google Scholar]
- B. Abdal Noor, S. Yi, Constr. Innov. 18 (2018) DOI: 10.1108/CI-05-2017-0040 [Google Scholar]
- J. M. Savolainen, A. Saari, A. Männistö, K. Kähkonen, J. Des. Technol. 16 (2018) DOI: 10.1108/JEDT-09-2017-0091 [Google Scholar]
- J. P. Spillane, L. O. Oyedele, Constr. Innov. 17 (2017) DOI: 10.1108/CI-11-2015-0063 [Google Scholar]
- Project management templates URL: www.method123.com/ (Last accessed: 30.03.2021) [Google Scholar]
- American society for quality URL: asq.org/ (Last accessed: 30.03.20211) [Google Scholar]
- R. A. Ibragimov, E. V. Korolev, T. R. Deberdeev, V. V. Leksin, Struct. Concr., 20 (2019) DOI: 10.1002/suco.201800008 [Google Scholar]
- N. Pugacheva, T. Kirillova, O. Kirillova, A. Luchinina, I. Korolyuk, A. Lunev, Int. J. Emerg. Technol. Learn., 15 (2020) [Google Scholar]
- A. N. Lunev, R. S. Safin, E. A. Korchagin, D. K. Sharafutdinov, T. V. Suchkova, L. V. Kurzaeva, S. R. Nikishina, N. A. Kuznetsova, Int. Rev. Manag. Mark., 6 (2016) [Google Scholar]
- A. Pedro, Q. T. Le, C. S. Park, J. Prof. Issues Eng. Educ. Pract., 142, 04015011 (2016) [Google Scholar]
- I. Terentyeva, A. Lunev, S. Kashina, L. Sadrieva, I. Korolyuk, N. Pugacheva, Int. J. Emerg. Technol. Learn., 15 (2020) DOI: 10.3991/ijet.v15i13.14655 [Google Scholar]
- Microsoft project URL: products.office.com/ru-ru/project/project-and-portfolio-management-software (Last accessed: 30.03.2021) [Google Scholar]
- Spider project URL: www.spiderproject.com/ru/ (Last accessed: 30.03.2021) [Google Scholar]
- I. Mirsayapov, I. Koroleva, in Procedia Eng. (2016) [Google Scholar]
- R. K. Mukhametrakhimov, L. V. Lukmanova, IOP Conf. Ser. Earth Environ. Sci. (2017) DOI: 10.1088/1755-1315/90/1/012112 [Google Scholar]
- V. L. Badenko, N. S. Bolshakov, E. B. Tishchenko, A. A. Fedotov, A. C. Celani, V. K. Yadykin, Mag. of Civil Eng., 101 (2020) DOI: 10.34910/MCE.101.14 [Google Scholar]
- A. Khuzin, R. Ibragimov, J. Build. Eng., 35, 102030 (2021) DOI: 10.1016/j.jobe.2020.102030 [Google Scholar]
- A. S. Pugacheva, V. P. Filippova, A. Y. Kon, L. B. Dorzhieva, I. S. Silchenok, N. B. Pugacheva, A. N. Lunev, A. A. Mustafina, Int. Rev. Manag. Mark., 6 (2016) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.