Open Access
Issue
E3S Web Conf.
Volume 276, 2021
2021 5th International Conference on Water Conservancy, Hydropower and Building Engineering (WCHBE 2021)
Article Number 01015
Number of page(s) 5
Section Water Conservancy and Hydropower and Natural Geological Exploration
DOI https://doi.org/10.1051/e3sconf/202127601015
Published online 23 June 2021
  1. Arockiasamy M., Reddy D.V., Sivakumar M., et al. Fatigue Loading and Temperature Distribution in Single Cell Segmental Box Bridges [J]. Practice Periodical on Structural Design & Construction, (2008), 13(3): 118–127. [Google Scholar]
  2. Ma S.J., Ying S., Dai Z.P. Study on Construction Technology of Precast Segmental Bridge [J]. Municipal Technology, (2006), 024(003): 148–152. [Google Scholar]
  3. Huang Y., Wu X. Study on Prefabrication and Installation Technology of Broad Width Box Girder Segment for Approach Bridge of Quanzhou Bay Bridge [J]. Construction Technology, (2015). [Google Scholar]
  4. Liu H.L., Xu D.Z. Humen Bridge across 62 .5 m Segmental PC continuous rigid frame bridge design department [J]. Heilongjiang Transportation Technology, (2015), 000(005): 66–67. [Google Scholar]
  5. Li X.B. Study on the mechanical characteristics of externally prestressed concrete box girder assembled with precast segments [D]; Academy of Railway Sciences, (2003). [Google Scholar]
  6. Ai Z.L. Research on construction technology of shortline matching prefabrication and cantilever assembly of box girder [D]; Southeast University, (2006). [Google Scholar]
  7. Miao Y.U., Zou H. Application of Novel Temporary Tension System in Short-Line Matching Cantilever Assembly Bridge [J]. (2017). [Google Scholar]
  8. Deng G. Design of Temporary Prestress in Cantilever Construction of Precast Segmental Beams [J]. Transportation Science & Technology, (2019), 000(003): 24–25, 9. [Google Scholar]
  9. Zhang Q.C., Wang B.B. Intelligent complete construction technology of precast segment beam prestress system [J]. Engineering Quality, (2020), 038(0z1): 32–34, 40. [Google Scholar]
  10. Zhou J. Short-line Prefabrication and Cantilever Assembly Technique of Sutong Bridge 75 m Continuous Pre-stressed Concrete Girder [J]. Modern Transportation Technology, (2007).. [Google Scholar]
  11. Chen D. On shear lag effect analysis of prestressed box girder at cantilever construction stage [J]. Shanxi Architecture, (2012). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.