Open Access
Issue
E3S Web Conf.
Volume 281, 2021
IV International Scientific Conference “Construction and Architecture: Theory and Practice of Innovative Development” (CATPID-2021 Part 1)
Article Number 08007
Number of page(s) 7
Section Economy in the Industry
DOI https://doi.org/10.1051/e3sconf/202128108007
Published online 02 July 2021
  1. B.A. Volkov, V.Ya. Shulga, A.A. Gavrilenkov, Assessment of economic efficiency and innovation in railway transport: textbook. allowance (“Training and Methodological Center for Education in Railway Transport”, M., 2009) [Google Scholar]
  2. M.V. Gracheva, S.Ya. Babaskin, I.M. Volkov, ed. M.V. Gracheva, Risk analysis of an investment project: Textbook for universities (Unity-Dana, M., 2001) [Google Scholar]
  3. Yu.E. Gurova, Bulletin of St. Petersburg State Transport University, SPb 3(24), 216–226 (2010) [Google Scholar]
  4. A.A. Drokin, Financial risk management 1, 68–79 (2009) [Google Scholar]
  5. Yu.A. Zakharov, Development of risk assessment models for investment projects of financial leasing, PhD Thesis, specialty: “Mathematical and instrumental methods of economics”, 08.00.13 (Moscow Aviation Institute, M., 2007) [Google Scholar]
  6. Information business portal: Methods for optimizing an investment portfolio according to the model of G. Markowitz, http://www.market-pages.ru/invest/12.html// ( date of the application: 11.07.2020). [Google Scholar]
  7. S.A. Koshechkin, Methods of quantitative analysis of the risk of investment projects, BusinessCom, http://www.koshechkin.narod.ru (access date 25.04.2021). [Google Scholar]
  8. A.V. Kruppa, Management of investment resources of an industrial enterprise in conditions of risk and uncertainty, PhD Thesis, specialty: “Economics and management of the national economy: organization and management of enterprises, industries, complexes”, 08.00.05 (M., 2009) [Google Scholar]
  9. A.P. Kuvshinov, A.V. Lukashov, Corporate Finance Management: St. Petersburg 3, 154–157 (2009) [Google Scholar]
  10. A.P. Kulikovskiy, M.A. Lukyanova, Modeling the risk assessment of an investment project based on the Monte Carlo method, Proceedings of the Conference, Simferopol: (IEiU) 86–87 (2017) [Google Scholar]
  11. A. A. Lobanov, A. V. Chugunov, Encyclopedia of financial risk management (Alpina Publisher, M., 2003) [Google Scholar]
  12. I.Ya. Lukasevich, Financial risk management 4, 306–324 (2006) [Google Scholar]
  13. A.V. Lukashov, Corporate finance management 1, 22–39 (2007) [Google Scholar]
  14. Methodological recommendations for assessing the effectiveness of investment projects (Second edition, revised and supplemented) (Approved. Ministry of Economy of the Russian Federation, Ministry of Finance of the Russian Federation and Gosstroy of the Russian Federation from 21.06.1999 No. 477) (Moscow, 1999) [Google Scholar]
  15. Methodological recommendations for the assessment of investment projects in railway transport (Appendix to the instruction of the Ministry of Railways of Russia dated August 31, 1998. N B-1024u) (Ministry of Railways of Russia, Moscow, 1998) [Google Scholar]
  16. Methodology for assessing the socio-economic efficiency of the construction of new railway lines. JSC “Russian Railways” with the participation of specialists from ISA RAS, headed by, professor V. N. Livshits (JSC “VNIIZhT”, SGUPS, 2008) [Google Scholar]
  17. F.Kh. Knight, Risk, uncertainty and profit (Translation from English M.Ya. Kazhdan; edited by V.G. Grebennikov) (Series: Modern institutional and economic theory.) (Delo, M., 2003) [Google Scholar]
  18. A.N. Nefedov Mathematical modeling, assessment and selection of multi-period investment projects in conditions of risk, PhD Thesis, specialty: “Mathematical modeling, numerical methods and program complexes”, 05.13.18, (Tver State University, Tver, 2008) [Google Scholar]
  19. S.G. Oparin, Yu.I. Teterin, Reliability and quality control 2, 57–68 (1991) [Google Scholar]
  20. S.G. Oparin, E.V. Esipova, and Yu.E. Gurova, Probabilistic assessment of the efficiency of investments in transport construction taking into account uncertainty and risk by the method of integral convolutions of numerical sequences, Intern. scientific conference “Transport of the 21st century”, Warsaw, 2010 [Google Scholar]
  21. S.G. Oparin, A.E. Stasishina-Olshevskaya, Method of identification and construction of the risk profile of investment projects when carrying out their cost assessment, Proceedings of the conference (RISKE-2018), SPB 72–83 (2018) [Google Scholar]
  22. T.K. Retinskaya, Assessment of the risks of real investment projects: PhD Thesis, specialty: “Economics and management of the national economy: theory of management of economic systems; macroeconomics; economics, organization and management of enterprises, industries, complexes; innovation management; regional economy; logistics; labor economics”, 08.00.05 (Nizhny Novgorod State Technical University, Nizhny Novgorod, 2009) [Google Scholar]
  23. V.V. Romanov, Modeling a quantitative assessment of the risk of an investment project under conditions of uncertainty, PhD Thesis, specialty: “Mathematical and instrumental methods of economics”, 08.00.13 (Perm State University, Perm, 2005) [Google Scholar]
  24. O.A. Tretyakov, Method of economic analysis of risks during contract bidding in transport construction, PhD Thesis, specialty: “Economics and management of the national economy: theory of management of economic systems; macroeconomics; economics, organization and management of enterprises, industries, complexes; innovation management; regional economy; logistics; labor economics”, 08.00.05 (SPb., 2005) [Google Scholar]
  25. N.P. Udal, Methodology for assessing the risk of an investment project for various levels of uncertainty of design information, PhD Thesis, specialty: “Finance, money circulation and credit”, 08.00.10, (Moscow Institute of Entrepreneurship and Law, M., 2007) [Google Scholar]
  26. Q. Zhao, G. Liu, G. Gu, Journal of Mathematical Finance 3(4), 431–436 (2013). doi: DOI: 10.4236/jmf.2013.34045. [Google Scholar]
  27. D. Ding, Q. Fu, J. So, Technology and Investment 3 (2), 121–125 (2012). doi: DOI: 10.4236/ti.2012.32015. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.