Open Access
Issue |
E3S Web Conf.
Volume 294, 2021
2021 6th International Conference on Sustainable and Renewable Energy Engineering (ICSREE 2021)
|
|
---|---|---|
Article Number | 02002 | |
Number of page(s) | 7 | |
Section | Power Systems and Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202129402002 | |
Published online | 26 July 2021 |
- Hu Junhui, Sheng Dakai, Xi Xin, Qi Lizhong. Building a digital design system and leading the development direction of power grid construction [J]. Electric Power Construction, 2012, 33(12): 1-5. [Google Scholar]
- Sheng Dakai, Xie Xin, Hu Junhui, et al. Research and development of grid information model (GIM) technology to build a smart grid information sharing platform[J]. Electric Power Construction, 2013, 34(8): 1-5. [Google Scholar]
- Sun Bin. A survey report on the application of three-dimensional technology in the United States and Japan [J]. Electric Power Survey and Design, 2004, 06(5): 8-13. [Google Scholar]
- Wu Liangliang. The application prospect of BIM’s information sharing function in construction enterprises[J]. China Engineering Consulting, 2013(12):50-51. [Google Scholar]
- Zhang Fangning. Construction and research of three-dimensional visualization construction management system for power grid engineering[J]. Science and Technology Innovation Guide, 2016(11):8182. [Google Scholar]
- Zeng Liang. Research and application of threedimensional technology in domestic power plant design[D]. Changsha: Central South University, 2010.1-4. [Google Scholar]
- Wang Yili, Wang Shaoning. Threedimensional technology based on PDMS of Jiangsu Electric Power Design Institute [J]. Industrial Control Computer, 2003, 16(12): 5-6. [Google Scholar]
- Liu Xiaodong, Li Chunhong. Research on the development of multi-discipline threedimensional collaborative design collaboration [J]. Science and Technology Information Development and Economy, 2006, 16(19): 159-161. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.