Open Access
Issue
E3S Web Conf.
Volume 336, 2022
The International Conference on Energy and Green Computing (ICEGC’2021)
Article Number 00072
Number of page(s) 5
DOI https://doi.org/10.1051/e3sconf/202233600072
Published online 17 January 2022
  1. Zilberova, I., Petrov, K., & Artsishevsky, M. (2020, February). Actual problems of management quality control of a construction company. In IOP Conference Series: Materials Science and Engineering (Vol. 753, No. 4, p. 042020). IOP Publishing. [CrossRef] [Google Scholar]
  2. Shirina E, Gaybarian O, Myasischev G 2017 Effective management of construction company in terms of linguistic communication IOP Conf. Series: Earth and Environmental Science 90012077. [Google Scholar]
  3. Klyuchnikova O V, Kostyuchenko V V, Pobegaylova E V 2014, Organization management from psychological components to its structuring (Rostov-Don). [Google Scholar]
  4. Klyuchnikova O V 2013 The effectiveness of the project excavate for laying utility networks Inženernyj Vestnik Dona 4 URL:http://www.ivdon.ru/ru/magazine/archive/n4y2013/2072. [Google Scholar]
  5. Encyclopedia of the Don region The jubilee album devoted 70 years the Rostov region (Rostov-Don). [Google Scholar]
  6. Keeling R P 2007 Horizontal and Vertical structures: The dynamics of organization in higher education (Liberal Education) 22-3. [Google Scholar]
  7. Masse P 1962 Optimal investment decisions (Englewood Cliffs N.J.). [Google Scholar]
  8. Oleynik P P 2001 Organization of construction, Conceptual framework, models and methods, information and engineering systems Profizdat (Moscow). [Google Scholar]
  9. Pobegaylov O A, Voronin A A 2013 The key component of the human resource management system Inženernyj Vestnik Dona 3 http://www.ivdon.ru/ru/magazine/archive/n3y2013/1778. [Google Scholar]
  10. Thomas G. Atkinson. “Civil Engineering of Buildings -History of San Diego” Journal, 2002, Vol. 48. [Google Scholar]
  11. Calabrese, A. (2013). Master in strategic project management (European), a worldwide experience. Procedia-Social and Behavioral Sciences, 74, 488-497. [CrossRef] [Google Scholar]
  12. Bazaraa, M., and Jarvis J. “Linear Programming and Network Flows” John-Wiley and Sons., New York, 1977. [Google Scholar]
  13. Mohammed, T., Haron, N., Alias, A., Muhammad, I. B., & Baba, D. (2018). Improving cost and time control in construction using building information model (BIM): A review. [Google Scholar]
  14. Shaqour, E. N. (2021). The role of implementing BIM applications in enhancing project management knowledge areas in Egypt. Ain Shams Engineering Journal. [Google Scholar]
  15. Khodeir, L. M., & Nessim, A. A. (2018). BIM2BEM integrated approach: Examining status of the adoption of building information modelling and building energy models in Egyptian architectural firms. Ain Shams Engineering Journal, 9(4), 1781-1790. [CrossRef] [Google Scholar]
  16. Shenhar, A.J, Dvir D, Levy O, Maltz. A C. (2001), Project Success: A Multidimensional Strategic Concept, Journal of Long Range Planning, Vol 34, issues 6, page 699-725. [CrossRef] [Google Scholar]
  17. Wite, A., (1988). Measurement of project success. International Journal of Project Management 6 (3), 164–170. [CrossRef] [Google Scholar]
  18. Pheng, L., Chuan, Q., (2006). Environmental factors and work performance of project managers in the construction industry. International Journal of Project Management 24, 24–37. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.