Open Access
Issue
E3S Web Conf.
Volume 341, 2022
2022 7th International Conference on Green Materials and Environmental Engineering (GMEE2022)
Article Number 01020
Number of page(s) 5
DOI https://doi.org/10.1051/e3sconf/202234101020
Published online 31 January 2022
  1. Maqsood I., Huang G. H., Yeomans J. S. (2005). An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty. European Journal of Operational Research, 167(1):208-225. http://doi.org/10.1016/j.ejor.2003.08.068 [Google Scholar]
  2. Khatiri K. N., Niksokhan M. H., Sarang A., Kamali A. (2020). Coupled simulation-optimization model for the management of groundwater resources by considering uncertainty and conflict resolution. Water Resources Management, 34(11):3585-3608. http://doi.org/10.1007/s11269-020-02637-x [Google Scholar]
  3. Kong X. M., Huang G. H., Fan Y. R., Li Y. P., Zeng X. T., Zhu Y. (2017). Risk analysis for water resources management under dual uncertainties through factorial analysis and fuzzy random value-at-risk. Stochastic Environmental Research & Risk Assessment, 31:2265–2280. http://doi.org/ 10.1007/s00477-017-1382-3 [Google Scholar]
  4. Shiraz R.K., Tavana M., Fukuyama H. (2020). A random-fuzzy portfolio selection DEA model using value-at-risk and conditional value-at-risk criteria. Soft Computing, 24:17167–17186. http://doi.org/10.1007/s00500-020-05010-7 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.