Open Access
Issue
E3S Web Conf.
Volume 347, 2022
2nd International Conference on Civil and Environmental Engineering (ICCEE 2022)
Article Number 05009
Number of page(s) 6
Section Disaster and Construction Management
DOI https://doi.org/10.1051/e3sconf/202234705009
Published online 14 April 2022
  1. A. Abobakr, Necessity of Cost Control Process (Pre-& Post-Contract Stage) in Construction Projects. (2017) [Google Scholar]
  2. E. Antohie, Classes of Construction Cost Estimates, Bulletin of the Polytechnic Institute of Jassy, 55.4: 21 (2009) [Google Scholar]
  3. A. Ashworth, S. Perera,. Cost Studies of Buildings. Routledge (2015) [CrossRef] [Google Scholar]
  4. A. A. A. Azis, A. H. Memon, I. A. Rahman, Q. B. A. I. Latif, S. Nagapan. Cost Management of Large Construction Projects in South Malaysia, ISBEIA 2012 – IEEE Symposium on Business, Engineering and Industrial Applications, pp. 625–629 (2012) [CrossRef] [Google Scholar]
  5. J. A. Botín, and M. A.Vergara, Resour. Policy, 46, pp. 212–218 (2015) [Google Scholar]
  6. M. Bovsunovskaya, Procedia Engineering, 165, pp. 960–964 (2016) [Google Scholar]
  7. T. Cunningham, Cost Control During the Pre-Contract Stage of a Building Project – An Introduction, Dublin Institute of Technology, pp. 1–26 (2015) [Google Scholar]
  8. J. Durkerly, Why Do We Need Good Construction Cost Management? Accessible: https://www.lorman.com/resources/why-do-we-need-good-construction-costmanagement-15750 (2014) [Google Scholar]
  9. A.M.F. Albtoush, S.I. Doh, A.R.B.A. Rahman, J.F.A.A. Albtoush, Int. J. Civ. Eng, 11(1), pp. 105–111 (2020) [Google Scholar]
  10. A.Girma, M. G.Alemu, J. emerg. technol, 5(5), pp. 51–58 (2018) [Google Scholar]
  11. D.Grahovac, V.Devedzic, Expert Syst. Appl., 37(12), pp. 7684–7695 (2010) Inaccurate activity cost estimate 147 3.59 .834 6 Allocation of direct, indirect and joint cost 147 3.51 .814 7 Ineffective frequency of project budget updates 147 3.37 .828 8 Wrong method of estimation 147 3.24 1.083 9 [Google Scholar]
  12. M.Høylandskjaer, Managerial Perceptions of Scope Creep in Projects: A Multiple-Case Study (2018) [Google Scholar]
  13. H.Kerzner, . Project Management: A Systems Approach to Planning, Scheduling, and Controlling. (12th ed.). John Wiley & Sons (2017) [Google Scholar]
  14. R. A. Khan,, M. S.Liew, Z. Bin Ghazali, Malaysian Construction Sector and Malaysia Vision 2020: Developed Nation Status, Procedia - Social and Behavioral Sciences. 109, pp. 507–513 (2014) [CrossRef] [Google Scholar]
  15. D.Lock,. The Essentials of Project Management – Fourth Edition. Routledge-Taylor & Francis Group (2014) [Google Scholar]
  16. M.Miri, M.Khaksefidi, Mediterr. J. Soc. Sci, 6(6), pp. 209–215 (2015) [Google Scholar]
  17. C. P. A. Mondejar, Assessment of Factors Affecting Cost Estimation on Project Cost Management in Small, Medium, and Large Construction Firms Using Factor and Multivariate Regression Analyses (2017) [Google Scholar]
  18. A.Othman, M. Abdellatif, J. Eng. Des. 9(3), pp. 273–295 (2011) [Google Scholar]
  19. Project Management Institute. A Guide to the Project Management Body of Knowledge, PMBOK Guide,7th Edition (2021) [Google Scholar]
  20. L. I. Obi, B. Awuzie, R. Islam, A.D. Gupta, R.Walton, Constr. Innov., 21(4), pp. 625–647 (2021) [Google Scholar]
  21. N. Shanmuganathan, G.Baskar, Int. j. adv. Eng., 7(2) pp.743–747 (2016) [Google Scholar]
  22. Z. Shehu, I. R. Endut, A. Akintoye, G. D. Holt., Int. J. Proj. 32(8), pp. 1471–1480 (2014) [Google Scholar]
  23. J. Q. Tang, M.P. Zhang, H. Tang, Y. Chen, Research on Cost Management of Construction Project Based on Activity-based Costing, in International Conference on Civil, Materials and Environmental Sciences, pp. 51–54 (2015) [Google Scholar]
  24. W. K.Tang. Cost Management for Building Contractors in Hong Kong. (2005) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.