Open Access
Issue
E3S Web Conf.
Volume 464, 2023
The 2nd International Conference on Disaster Mitigation and Management (2nd ICDMM 2023)
Article Number 09008
Number of page(s) 3
Section New Technologies and Tools for Disaster Evaluation
DOI https://doi.org/10.1051/e3sconf/202346409008
Published online 18 December 2023
  1. National Standardization Agency, Procedures for Calculating Concrete Structures for Buildings. SNI 03-2847-2002, Bandung: Badan Standardisasi Nasional, p. 251, (2002) [Google Scholar]
  2. Bilodeau and V. M. Malhotra, High- Volume Fly Ash System: Concrete Solution for Sustainable Development, ACI Mater J, (1993) [Google Scholar]
  3. M. Solikin and Susilo, The Effect of Using Rice Husk Ash as Cementitious on the Development of Compressive Strength of Concrete, (2016) [Google Scholar]
  4. BPS, Rice Harvest Area, Production and Productivity 2016-2022 West Sumatra Province, Central Bureau of Statistics. [Online]. Available: https://sumbar.bps.go.id/indicator/53/57/1/luas-panen-produksi-dan-produktivitas-padi.html, (2022). [Google Scholar]
  5. B. Singh. in Woodhead Publishing Series in Civil and Structural Engineering. 417–460. (2018) [Google Scholar]
  6. ACI Committee 211.1, Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete, in American Concrete Institute: Detriot Michigan, (1995) [Google Scholar]
  7. H. A. Safarizki, M. Marwahyudi, and W. A. Pamungkas, Jurnal Riset Rekayasa Sipil, 4 (2), 63, (2021) [CrossRef] [Google Scholar]
  8. D. F. Houston, Rice Bran and Polish, in Rice: Chemistry & Technology, 1st ed., Minnesota, USA: Assoc. Cereal Chem. Inc., pp. 272–671, (1972) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.