Open Access
Issue |
E3S Web Conf.
Volume 464, 2023
The 2nd International Conference on Disaster Mitigation and Management (2nd ICDMM 2023)
|
|
---|---|---|
Article Number | 15005 | |
Number of page(s) | 9 | |
Section | Retrofit, Rehabilitation and Reconstruction | |
DOI | https://doi.org/10.1051/e3sconf/202346415005 | |
Published online | 18 December 2023 |
- Ichsan, R. N., Nasution, L., & Sinaga, S., Business feasibility study, CV. Sentosa Deli Mandiri, Medan (2019) [Google Scholar]
- Novianti, T., Introduction to Project Evaluation. Gramedia Pustaka Utama, Jakarta (1992) [Google Scholar]
- Department of Public Works, Feasibility Study of Road and Bridge Projects (2005) [Google Scholar]
- Japan International Cooperation Agency. Chapter 3: Traffic Demand Forecast ‘‘Final Project: The Kanchpur, Meghna, Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project” (n.d) [Google Scholar]
- Ministry of Public Works and Public Housing, Directorate General of Highways, Road Pavement Design Manual (2017) [Google Scholar]
- Japan International Corporation Agency, Feasibility Studi On Bogor-Bandung Road Project (1990) [Google Scholar]
- Giatman, M. Economy Technical. Raja Gravindo Persada, Jakarta (2006) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.