Open Access
Issue
E3S Web of Conf.
Volume 388, 2023
The 4th International Conference of Biospheric Harmony Advanced Research (ICOBAR 2022)
Article Number 01004
Number of page(s) 7
Section Sustainable Infrastucture, Industry, Architecture, and Food Technology
DOI https://doi.org/10.1051/e3sconf/202338801004
Published online 17 May 2023
  1. R. Indrayani, Analisis risiko keselamatan kerja pada proyek pengembangan bandara internasional Juanda terminal 2 Surabaya, J. IKESMA 13, 2, pp. 77-93 (2017) [Google Scholar]
  2. I. M. Ramdan, H. N. Handoko, Kecelakaan kerja pada pekerja konstruksi informal di kelurahan "X" kota Samarinda, J. MKMI 12, 1, pp. 1-6 (2016) [Google Scholar]
  3. B. Susilo, A. Jessica, Andi, Perencanaan dan evaluasi keselamatan kerja pekerjaan pemancangan pada proyek "X" di Surabaya, J. Dimensi Pratama Teknik Sipil (Universitas Kristen Petra Indonesia) 5, 2, pp. 1-8 (2016) [Google Scholar]
  4. Filbert, Garry, Sugie, Jonathan, Evaluasi sistem manajemen K3 terhadap metode pemancangan jack-in pile, J. Dimensi Pratama Teknik SIpil Universitas Kristen Petra 2, 2, pp. 1-8 (2013) [Google Scholar]
  5. E. Kurniawati, Sugiono, R. Yuniarti, Analisis potensi kecelakaan kerja pada departemen produksi springbed dengan metode hazard identification and risk assessment (HIRA) (studi kasus: PT malindo intitama raya, Malang, Jawa Timur), J. Rekayasa dan Manajemen Sistem Industri Universitas Brawijaya 2, 1, pp. 11-23 (2014) [Google Scholar]
  6. A. A. Gunawan, L. Y. Bendatu, Perbaikan keselamatan dan kesehatan kerja dengan metode HIRARC di PT sumber rubberindo jaya, J. Titra 3, 2, pp. 421-426 (2015) [Google Scholar]
  7. S. Wiguna, Identifikasi bahaya pada pekerja proyek pengendalian banjir sungai asahan paket 2 PT pembangunan perumahan (persero) tbk tahun 2018 (Universitas Sumatera Utara, Medan, 2018) [Google Scholar]
  8. M. Iman, Analisa risiko kecelakaan kerja pada proyek jembatan sembayat baru II kabupaten gresik dengan menggunakan metode FMEA (failure mode and effect analysis) (Institut Teknologi Sepuluh Nopember, Surabaya, 2018) [Google Scholar]
  9. T. Erba, Rencana kesehatan dan keselamatan kerja kontrak (RK3K) menggunakan metode hazard identification risk assessment and risk control (HIRARC) yang mengacu pada bangunan green building pada proyek pembangunan the samator Surabaya (Institut Teknologi Sepuluh Nopember, Surabaya, 2018) [Google Scholar]
  10. M. Fuad, M. Indrayadi, S. M. Nuh, Penerapan K3 (keselamatan dan kesehatan kerja) menggunakan metode HIRADC (hazard identification, risk assessment, and determining control) dan JSA (job safety analysis) pada proyek pembangunan gedung direktorat reserse kriminal khusus polda KalBar, JeLAST: J. PWK, Laut, Sipil, Tambang 6, 2, pp. 1-5 (2015) [Google Scholar]
  11. L. Widojoko, Analisa dan desain pondasi tiang pancang berdasarkan bentuk tiang, J. Teknik Sipil Universitas Bandar Lampung 6, 2, pp. 1-29 (2015) [Google Scholar]
  12. Suwinardi, Manajemen risiko proyek, ORBITH: J. Politeknik Negeri Semarang 12, 3, pp. 145-151 (2016) [Google Scholar]
  13. K. R. Roehan, Yuniar, A. Desrianty, Usulan perbaikan sistem manajemen keselamatan dan kesehatan kerja (SMK3) menggunakan metode hazard identification and risk assesment (HIRA), Reka Integra: J. Online Institut Teknologi Nasional 2, 2, pp. 1-10 (2014) [Google Scholar]
  14. R. Fauzan, N. B. Puspitasari, Evaluasi bahaya kerja menggunakan metode hazard identification risk assessment and risk control dalam memproduksi rak engine overhoul pada CV mansgroup, Industrial Engineering Online J. 5, 4, pp. 1-8 (2016) [Google Scholar]
  15. A. M. Mayadilanuari, Penggunaan HIRARC dalam identifikasi bahaya dan penilaian risiko pada pekerjaan bongkar muat, HIGEIA J. Public Health Research and Development 4, 2, pp. 245-255 (2020) [Google Scholar]
  16. DOSH, Guidelines for hazard identification, risk assessment, and risk control (HIRARC) (Ministry of Human Resources of Malaysia: Department of Occupational Safety and Health, Malaysia, 2008) [Google Scholar]
  17. M. A. Memon, H. Ting, J. Cheah, R. Thurasamy, F. Chuah, T. H. Cham, Sample size for survey research: review and recommendations, J. Applied Structural Equation Modeling 4, 2 (2020) [CrossRef] [Google Scholar]
  18. J. T. Roscoe, Fundamental research statistics for the behavioral sciences (2nd Ed.) (Holt Rinehart and Winston, New York, 1975) [Google Scholar]
  19. R. W. E. Yani, Uji validitas dan reliabilitas dalam penelitian epidemiologi kedokteran gigi, J. Stomatognatic (J.K.G. Unej) 8, 1, pp. 27-34 (2011) [Google Scholar]
  20. N. M. Janna, Konsep uji validitas dan reliabilitas dengan menggunakan SPSS, J. STAI-DDI (2021) [Google Scholar]
  21. S. Stevens, Introduction to statistics: think and do (Worldwide Center of Mathmatics LLC, Massachusetts, 2013) [Google Scholar]
  22. Z. Matondang, Validitas dan reliabilitas suatu instrumen penelitian, J. Tabularasa PPS UNIMED 6, 1, pp. 87-97 (2009) [Google Scholar]
  23. K. S. Taber, The use of cronbach’s alpha when developing and reporting research instruments in science education, Research in Science Education 48, pp. 1273-1296 (2017) [Google Scholar]
  24. T. D. A. Nuryadi, E. S. Utami, M. Budiantara, Uji normalitas data dan homogenitas data (Sibuku Media, Yogyakarta, 2017) [Google Scholar]
  25. C. R. Mehta, N. R. Patel, IBM SPSS exact tests (IBM Corp, Massachusetts, 2013) [Google Scholar]
  26. A. A. B. Dharma, I. G. A. A. Putera, A. A. D. Parami, Manajemen risiko keselamatan dan kesehatan kerja (K3) pada proyek pembangunan jambuluwuk hotel & resort petitenget, J. Spektran 5, 1, pp. 47-55 (2017) [Google Scholar]
  27. AS/NZS, Third edition AS/NZS 4360:2004 about risk management (Standards Australia International & Standards New Zealand, 2004) [Google Scholar]
  28. R. Kristiana, D. D. Wijaya, Aplikasi model HIRARC dan metode JSA untuk evaluasi potensi kecelakaan kerja proyek, in Prosiding Seminar Nasional Teknik Tahun 2020 (SENANSTIKA 2020), pp. 94-107 (Universitas Islam Kalimantan Muhammad Arsyad Al Banjari, Banjarmasin, 2020) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.