Open Access
Issue
E3S Web of Conf.
Volume 388, 2023
The 4th International Conference of Biospheric Harmony Advanced Research (ICOBAR 2022)
Article Number 01006
Number of page(s) 5
Section Sustainable Infrastucture, Industry, Architecture, and Food Technology
DOI https://doi.org/10.1051/e3sconf/202338801006
Published online 17 May 2023
  1. I. M. Salain, Analisis risiko keterlambatan pelaksanaan proyek konstruksi hotel di Bali, J. Spektran 7, 2, pp. 212-221 (2019) [Google Scholar]
  2. Iswanto, Manajemen risiko terhadap pengendalian waktu proyek pembangunan pelabuhan dermaga (2017) [Google Scholar]
  3. M. Hanafi, Manajemen risiko, pp. 39-50 (2016) [Google Scholar]
  4. American Society of Safety Engineers, American national standards: risk assessment techniques (Des Plaines: American Society of Safety Engineers, 2011) [Google Scholar]
  5. T. L. Saaty, Axiomatic foundation of the analytic hierarchy process management science, pp. 841-855 (1986) [Google Scholar]
  6. I. A. Jabbar, Analisis nilai ekstrem tinggi gelombang di samudra hindia tropis bagian tenggara (2019) [Google Scholar]
  7. P. F. J. Joubert, P. Pretorius, Design and construction risks for a shipping port and container terminal: case study (2020) [Google Scholar]
  8. Ismiati, Penerapan manajemen resiko pada pembangunan proyek perpanjangan dermaga, studi kasus: pelabuhan dalam tanjung emas (2020) [Google Scholar]
  9. Maritime Directorate, Construction safety plan of sanur project, Ministry of Transportation (2020) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.