Open Access
Issue
E3S Web of Conf.
Volume 402, 2023
International Scientific Siberian Transport Forum - TransSiberia 2023
Article Number 12021
Number of page(s) 7
Section Geotechnical Engineering, Road and Bridge Construction
DOI https://doi.org/10.1051/e3sconf/202340212021
Published online 19 July 2023
  1. Sh. Mirziyoev, The message of the President of the Republic of Uzbekistan to Oliy Majlis of the Republic of Uzbekistan, Newspaper “People’s voice” No. 275-276, 30 December 2020. [Google Scholar]
  2. H. Heimann. Effects of air pollution on human health. In Air pollution. (Geneva. WHO, 2011.) [Google Scholar]
  3. Karl T.R., Melillo J.M., and Peterson T.C., 2009. Global Climate Change Impacts in the United States. Cambridge University Press. www.globalchange.gov/usimpacts. [Google Scholar]
  4. M.V. Nemchinov et al., Ecological problems of construction and exploitation of roads. Moscow. Irkutsk, Moscow Automobile and Road Construction State Technical University, Irkutsk Regional Road Education Center, 1997, p. 231 [Google Scholar]
  5. Fayzibaev Sh.S., Abdullaev B.A. Analysis and perspective of logistics development of perishable good in the Republic of Uzbekistan. Transport bulletin of Povolzh, 2019, no. 3, p. 63. [Google Scholar]
  6. Lesov K.S. Technology of strengthening of embankment of railways of sandy soils with application of geosynthetic materials. Journal of Tashkent Institute of Railway Engineers, 2019, no. 2, pp. 11-16. [Google Scholar]
  7. Ecology/Under the editorship of L.I. Tsvetkova. Moscow, ACB publishing house, SPb: Himizdat, 2001, pp. 289-290. [Google Scholar]
  8. <collab>IEA</collab>, 2012. Key World Energy Statistics 2012. International Energy Agency. Paris, p. 80 [Google Scholar]
  9. <collab>PIANC</collab>, 2012. Dealing with the effects of climate change on road pavements. World Road Association (PIANC). Technical Committee D.2 Road Pavements, p. 146 [Google Scholar]
  10. Potter J, 2012. U.S. Transportation and Climate Change: Addressing the Adaptation Challenge Presentation at the UNECE International Conference on Adaptation of Transport Networks to Climate Change, Alexandroupolis (Greece), 24-26 June 2012. [Google Scholar]
  11. «Code on Roads» of the Republic of Uzbekistan. Collection of the legislative documents on roads of the Republic of Uzbekistan. Tashkent, 1997, p.50-59 [Google Scholar]
  12. Highways. ShNK 2.05.02-07. (State Committee of the Republic of Uzbekistan for Architecture and Construction, 2008), pp. 148-189. [Google Scholar]
  13. www.gazeta.uz Warming rates in Uzbekistan. [Google Scholar]
  14. Industry road regulations. ODN 218.046-01. Design of flexible pavement. State Road Service of the Ministry of Transport of the Russian Federation. Moscow: Informavtodor, 2001, p. 148. [Google Scholar]
  15. Design and calculation of non-rigid pavement. Under the editorship of I.N. Ivanov. Moscow, Transport, 1973, p.287. [Google Scholar]
  16. Industry road regulations. ODN 218.046-01. Design of flexible pavement. State Road Service of the Ministry of Transport of the Russian Federation. Moscow: Informavtodor, 2001, p. 148. [Google Scholar]
  17. Instructions for the design of non-rigid pavements. Departmental rules and regulations. MKN 46-2008. With change №1. Tashkent: “Uzavtoyul” State Joint Stock Company for the construction and operation of highways, 2015, p. 143. [Google Scholar]
  18. https://ru.wikipedia.org/wiki/Jizzakh region [Google Scholar]
  19. https://ru.climate-data.org/asia/ [Google Scholar]
  20. https://www.pogodaiklimat.ru/history [Google Scholar]
  21. https://www.gazeta.uz/ru/2019/08/08/water-stress/ [Google Scholar]
  22. Khalilov R.R. Factors of influence on the destruction of the road asphalt concrete structure in the conditions of Uzbekistan and ways to prevent it. Composite materials. Scientific, technical and industrial journal 2021, № 3, pp. 146-148 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.