Open Access
Issue
E3S Web Conf.
Volume 417, 2023
III International Conference on Geotechnology, Mining and Rational Use of Natural Resources (GEOTECH-2023)
Article Number 03012
Number of page(s) 6
Section Energy Saving and Energy Efficiency of Mining Enterprises, Other Industries and Transport Infrastructure
DOI https://doi.org/10.1051/e3sconf/202341703012
Published online 21 August 2023
  1. Decision of the President of the Republic of Uzbekistan on the strategy of further development and reform of the electric power industry in the Republic of Uzbekistan 4249 (2019) [Google Scholar]
  2. Republic of Uzbekistan Podgotovitelnyy obzor Project modernization of Navoiyskoy teploelektrostantsii: Agency for international cooperation (JICA) (2013) [Google Scholar]
  3. A.A. Korshikova, Prime nitelno k PGU-450T dissertation (Moscow, 2015) [Google Scholar]
  4. V.N. Loginova, Development of automated system control of parameters and diagnostics of battery batteries explanatory note to final qualification work (2016) [Google Scholar]
  5. N. Ataullayev, A. Ataullayev, S.M. Karimtoshovich, IOP Conference Series: Materials Science and Engineering (2021) [Google Scholar]
  6. Fam Kong Tao: dissertation and application of the candidate of technical sciences in Novocherkassk (2019) [Google Scholar]
  7. K.V. Dobrego, Y.V. Bladyko, Energetika. Proc. CIS Higher Educ. Inst. and Power Eng. Assoc. 64(1), 27–39 (2021) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.