Open Access
Issue
E3S Web Conf.
Volume 423, 2023
2023 7th International Workshop on Renewable Energy and Development (IWRED 2023)
Article Number 02006
Number of page(s) 7
Section Sustainable Energy Development and Energy Saving Technology
DOI https://doi.org/10.1051/e3sconf/202342302006
Published online 08 September 2023
  1. C. Yu, C.L. Yang, Q. Liu, et al. Research on Maintenance Management Strategies for Power Generation Equipment in Domestic and Foreign Hydroelectric Station [J]. Mechanical & Electrical Technique of Hydropower Station, 2019, 42(12):47-49+87. [Google Scholar]
  2. S. Zhu. A Dissertation Submitted in Partial Fulfilment of the Requirements for the Master’s Degree of Electrical Engineering [D]. China Three Gorges University, 2019. [Google Scholar]
  3. C.X. Hu. Coordinated Optimization of Water-level Regulation of Cascade Hydropower Stations, Midand Long-Term Maintenance Schedule and Transmission Schedule [D]. China Electric Power Research Institute, 2017. [Google Scholar]
  4. J.R. Dong and M.B. Liu. Research on Unit Maintenance Decision-making Method Based on Nash-Stackelberg Game [J]. GUANGDONG ELECTRIC POWER, 2023, 36(04):96-109. [Google Scholar]
  5. R.P. Li. Research on Dynamic Maintenance Planning of Hydroelectric components [D]. Northwest A&F University, 2021. [Google Scholar]
  6. B.L. Li. Study and Applications on Virtual Simulation and Automatic Planning for Maintenance of Hydropower Equipment [D]. Huazhong University of Science & Technology, 2020. [Google Scholar]
  7. M. Zhang, S.L. Wang, Z.Q. Jiang, et al. Research on Optimal Flood Control Dispatching of the Lower Stung Russie Chrum Hydropower Station Based on Dynamic Programming Algorithm [J]. Water Resources and Power, 2021, 39(11):127-131. [Google Scholar]
  8. Z.P. Zhao, S.L. Liao, C.T. Cheng, et al. Discrete gradient progressive optimality algorithm for midlong-term optimal operation of multi-reservoir system [J]. SHUILIXUEBAO, 2018, 49(10):1243-1253. [Google Scholar]
  9. Centralized Control Center of Yalong River Hydropower Development Company LTD. Research report on the cooperative dispatching scheme of the middle and lower reaches of the Yalong River [R]. 2020.12. [Google Scholar]
  10. J. Dai, Y.Q. Jiang, N.J. Tian, et al. Bi-level Optimization for Hydrothermal Unit Maintenance Considering Generation Right Transaction [J]. High Voltage Engineering, 2022, 48(10):4143-4153. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.