Open Access
Issue
E3S Web Conf.
Volume 439, 2023
2023 8th International Conference on Ecological Building and Green Building Material (EBGBM 2023)
Article Number 02004
Number of page(s) 8
Section Green Building Material and Material Property Research
DOI https://doi.org/10.1051/e3sconf/202343902004
Published online 27 October 2023
  1. Deng Julong. Basic method of grey system [M]. Huazhong University of Technology Press, 1987. [Google Scholar]
  2. Ding Jian, Su Ningchuan, Huang Tao. Construction safety risk analysis and countermeasures for the transformation of old city shantytowns_Ding Jian[J]. Jiangxi Building Materials, 2021, No.271(8): 245–246. [Google Scholar]
  3. Jin Changhong, Gao Yuan. Research on the application risk of contract energy management in energy-saving transformation of shantytowns[J]. Journal of Tangshan College, 2015, 28(5): 45–47, 51. [Google Scholar]
  4. Liang, Yuzhu. Acceptable accountability: why are local officials “desperate”? --A case study of government demolition in shantytown redevelopment[J]. Journal of Public Administration, 2021, 18(2): 34–44, 166. [Google Scholar]
  5. Li Yongfu, Yu Tianqi. Risk evaluation of old neighbourhood renovation projects[J]. Engineering Economics, 2021, 31(12): 23–26. [Google Scholar]
  6. Li Qiong, Xiao Lizhi, Song Huijuan. Empirical Analysis of Urban Risk Assessment System[J]. Academic Exchange, 2022, Volume missing (2): 127–142, 192. [Google Scholar]
  7. Liu Dinghui, Yang Wentao. Study on the Problems and Countermeasures of Shantytown Renovation in Resource-Based Cities--Taking Huangshi City as an Example[J]. SAR Economy, 2023, Volume missing (2): 47–50. [Google Scholar]
  8. Ma Liqiang, Zhang Xuexue, Wang Cheng. Research on risk assessment of pre-decision-making of urban shantytown renovation project[J]. Journal of Shandong Institute of Commerce and Industry, 2020, 34(6): 56–65. [Google Scholar]
  9. Wang Baomin, Zhuang Shuchao. Reflection and Response to Compensation Problems in Shantytown Renovation[J]. Dongyue Lunshang, 2020, 41(4): 149–155. [Google Scholar]
  10. Abdel-Basset M., Gunasekaran M., Mohamed M., et al. A framework for risk assessment, management and evaluation: Economic tool for quantifying risks in supply chain [J]. Future Generation Computer Systems, 2018. [Google Scholar]
  11. Tepe S., Kaya İ. A fuzzy-based risk assessment model for evaluations of hazards with a real-case study [J]. Human and Ecological Risk Assessment, 2019. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.