Open Access
Issue
E3S Web Conf.
Volume 455, 2023
First International Conference on Green Energy, Environmental Engineering and Sustainable Technologies 2023 (ICGEST 2023)
Article Number 03015
Number of page(s) 13
Section Sustainable Technology in Construction
DOI https://doi.org/10.1051/e3sconf/202345503015
Published online 05 December 2023
  1. A.L. Hegde, A. Jain, Das, B.B. Das, S.V. Nanukuttan, A.K. Patnaik, N.S. Panandikar, (eds), “Recent Trends in Civil Engineering”, vol 105. Springer, Singapore. (2021) https://doi.org/10.1007/978-981-15-8293-6_37. [Google Scholar]
  2. Alan Twort, Gordon Rees, “Civil Engineering Project Management, Fourth Edition”, Elsevier - Business & Economics - 263 pages, (2003). [Google Scholar]
  3. S. A. Erdogan, J. Šaparauskas, Z. Turskis, “A Multi-Criteria Decision-Making Model to Choose the Best Option for Sustainable Construction Management Sustainability”, 11, 2239.(2019) https://doi.org/10.3390/su11082239. [Google Scholar]
  4. Milan Radosavljevic, John Bennett, John Wiley & Sons, “Construction Management Strategies: A Theory of Construction Management”, Technology & Engineering - 320 pages, (23-Apr-2012). [Google Scholar]
  5. Prof. Frank Harris, Prof. Ronald McCaffer, Andrew Baldwin, Francis Edum-Fotwe, “Modern Construction Management”, 8th Edition, ISBN: 978-1-119-48834-7, Wiley- Blackwell 608 Pages, (January 2021). [Google Scholar]
  6. Russell Kenley and Olli Seppänen, “Location-Based Management for Construction Planning, scheduling and control”, First published (2010) by Spon Press. [Google Scholar]
  7. Ogaja, A. Clement, “Applied GPS for engineers and project managers -Part 2: Applications in Engineering and Megaprojects”, Chapter 6, American Society of Civil Engineers, Virginia, pp. 101–112, (2011). [Google Scholar]
  8. Hossein Karimi, Ph.D., A.M. Asce; R. Timothy, B. Taylor, Gabriel, B., “Journal of Construction Engineering and Management”, Technical Papers, Impact of Skilled Labor Availability on Construction Project Cost Performance, Volume 144 Issue 7 - July (2018). [Google Scholar]
  9. A. Ojo, O. Ogunsina and D.R. Ogunsemi, “Assessment of cost management practices of civil engineering (project procurement) organisations in Ondo State, Nigeria”, Journal of Financial Management of Property and Construction, Vol. 27 No. 1, pp. 57–75, (2022). [CrossRef] [Google Scholar]
  10. A. Behman, T. Harfield, & R. Kenley, S. Kamaruzzaman, A. Ali., N. Azmi & S. Lin (Ed.),.”Construction management scheduling and control”: The familiar historical overview, Proceedings of the 4th International Building Controls Conference (pp.754759), (2016, 7-8 March). [Google Scholar]
  11. Cen-Ying Lee; Heap-Yih Chong; Pin-Chao Liao; and Xiangyu Wang, Journal of Management in Engineering, Volume 34 Issue 2, Technical Papers, “Critical Review of Social Network Analysis Applications in Complex Project Management”, March (2018). [Google Scholar]
  12. Giuseppe Miceli Junior, Nilde da Cunha Ribeiro, Paulo César Pellanda and Marcelo de Miranda Reis, “Implementation Framework for BIM Adoption and Project Management in Public Organizations”, Journal of Civil Engineering and Architecture 14, 109–119, (2020). [CrossRef] [Google Scholar]
  13. Sharma, Manoj Kumar, “Monte Carlo Simulation Applications for Construction Project Management”, International Journal of Civil Engineering and Technology, 11(2), 88–100, (2020). [Google Scholar]
  14. Yuv Zhenbao, Peng Hongtao, Zeng Xianyi, Sofi Massoud, Xing Hui, and Zhou Zhiyuan, “Smarter construction site management using the latest information technology”, Proceedings of the Institution of Civil Engineers - Civil Engineering 172:2, 89–95, (2019). [Google Scholar]
  15. Li Zhang, Bin Zhu and Yong Gang Zhang, “Civil Engineering Construction Project Management Based on Computer Technology”, IOP Publishing Ltd, Journal of Physics: Conference Series, Volume 1852, International Conference on Artificial Intelligence, Computer Networks and Communications (AICNC 2020) 27-30, Lijiang, Yunnan, China, December (2020). [Google Scholar]
  16. B. Nikmehr, M.R. Hosseini, I. Martek, E.K. Zavadskas, J. Antucheviciene. “Digitalization as a Strategic Means of Achieving Sustainable Efficiencies in Construction Management: A Critical Review”, Sustainability, 13, 5040, (2021). [CrossRef] [Google Scholar]
  17. R. Olofu, A. Ethan, and C. S. Papacostas, “Integrated GIS for construction site investigation” J. Constr. Eng. Manage., vol.120, no. 1, pp.211–222, (1994). [CrossRef] [Google Scholar]
  18. Chang Kang-tsung, “Introduction to Geographic Information Systems”, Tata McGraw- Hill Edition, New Delhi, p. 432, (2006). [Google Scholar]
  19. Yadhukrishnan, A.V., Amba Shetty, “A Review on GIS Based Construction Project Management”, International Advanced Research Journal In Science, Engineering And Technology Vol. 2, Issue 6, (2015). [Google Scholar]
  20. M. Y. Cheng and S. C. Yang, “GIS based cost estimates integrating with material layout planning.” J. Constr. Eng. Manage. vol. 11, no. 4, pp.291–299. (2001). [CrossRef] [Google Scholar]
  21. Mansour, N., Jaded “Application of GIS Based Construction Engineering: An Electronic Document Management System”, International Scholarly and Scientific Research and Innovation 10 (9), (2016). [Google Scholar]
  22. S. E. Poku, D. Arditi & M. Asce, “Construction Scheduling and Progress Control Using Geographical Information Systems”, Journal of computing in civil engineering @ASCE 20 (October), 351–360, (2006). [CrossRef] [Google Scholar]
  23. V. K. Bansal and M. Pal, “Potential of geographic information systems in building cost estimation and visualization”, Autom. Constr., vol. 16, no. 3, pp.311–322, (2007). [CrossRef] [Google Scholar]
  24. M. Y. Cheng and J.T. O’Connor, “ArcSite: Enhanced GIS for construction site layout”, J. Constr. Eng. Manage. vol. 122, no. 4, pp. 329–336, (1996). [CrossRef] [Google Scholar]
  25. L. Ruixue, & Z. Yicheng, “Analysis of BIM and GIS integration: results from literature review and questionnaire (Dissertation)”, (2021). [Google Scholar]
  26. T. Subramani, T.M. Karthick, “Study on Time and Resource Management in Construction Projects Using MS Project”, International Journal of Engineering & Technology 7(3.10):23, July (2018). [Google Scholar]
  27. P. M. Wale, N. D. Jain, N. R. Godhani, S. R. Beniwal, A.A. Mir, “Planning and Scheduling of Project using Microsoft Project(Case Study of a building in India)” IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684, p-ISSN: 2320-334X, Volume 12, Issue 3 Ver. III, PP 57–63, (May. - Jun. 2015). [Google Scholar]
  28. R.K. Vaidyanathan, “4D Model through GIS for Planning and Scheduling of Residential Construction Projects”, International journal of innovations in engineering and technology (April 2012). [Google Scholar]
  29. G. M. Naik, M. Aditya, & S.B. Naik, “Integrated 4D Model Development for Planning and Scheduling of a Construction Project using Geographical Information System”, 2nd International Conference on Construction and Project Management, IPEDR vol 15, (2011). [Google Scholar]
  30. A. C. Kumar, & T. Reshma, “4D Applications of GIS in Construction Management”, vol 2017, Article ID 1048540, 9 pages, (2017). [Google Scholar]
  31. G. Celeste; M. Lazoi; M. Mangia; G. Mangialardi, “Innovating the Construction Life Cycle through BIM/GIS Integration: A Review”, Sustainability, 14, 766, (2022). https://doi.org/10.3390/su14020766. [CrossRef] [Google Scholar]
  32. Vinayakumar, S. Petimani, Vishwanath Awati, J.V. Rashmi, “Monitoring the construction project by 4D application of GIS”, International Journal of Recent Technology and Engineering, ISSN: 2277-3878, Vol. 8, Issue-2, (2019). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.