Open Access
Issue
E3S Web Conf.
Volume 457, 2023
International Scientific and Practical Symposium “The Future of the Construction Industry: Challenges and Development Prospects” (FCI-2023)
Article Number 01017
Number of page(s) 10
Section Modern Building Materials
DOI https://doi.org/10.1051/e3sconf/202345701017
Published online 05 December 2023
  1. Abioye, S. O., Oyedele, L. O., Akanbi, L., Ajayi, A., Davila Delgado, J. M., Bilal, M., Akinade, O. O., and Ahmed, A. (2021). Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges. Journal of Building Engineering, 44, 1–13. https://doi.org/10.1016/jjobe.2021.103299 [CrossRef] [Google Scholar]
  2. Agyekum, K., Kukah, A. S., and Amudjie, J. (2022). The impact of COVID-19 on the construction industry in Ghana: the case of some selected firms. Journal of Engineering, Design and Technology, 20(1), 222–244. https://doi.org/10.1108/JEDT-11-2020-0476 [CrossRef] [Google Scholar]
  3. Alaghbari, W., Al-Sakkaf, A. A., and Sultan, B. (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), 79–91. https://doi.org/10.1080/15623599.2017.1382091 [CrossRef] [Google Scholar]
  4. Alaloul, W. S., Musarat, M. A., Liew, M. S., Qureshi, A. H., and Maqsoom, A. (2021). Investigating the impact of inflation on labour wages in the Construction Industry of Malaysia. Ain Shams Engineering Journal, 12(2), 1575–1582. https://doi.org/10.1016/j.asej.2020.08.036 [CrossRef] [Google Scholar]
  5. Ayodele, O. A., Chang-Richards, Y., and González, V. A. (2022). A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(2), 601–618. https://doi.org/10.1108/ECAM-05-2020-0358 [CrossRef] [Google Scholar]
  6. Bajpai, A., and Misra, S. C. (2022). Barriers to implementing digitalisation in the Indian construction industry. International Journal of Quality and Reliability Management, 39(10), 2438–2464. https://doi.org/10.1108/IJQRM-09-2020-0318 [CrossRef] [Google Scholar]
  7. Fellini, I., Ferro, A., and Fullin, G. (2007). Recruitment processes and labour mobility: The construction industry in Europe. Work, Employment and Society, 21 (2), 277–298. https://doi.org/10.1177/0950017007076635 [CrossRef] [Google Scholar]
  8. Gong, Z., Wu, Y., Tawiah, V., and Abdulrasheed, Z. (2023). The environmental footprint of international business in Africa; The role of natural resources. Resources Policy, 80(December 2022), 103239. https://doi.org/10.1016Zj.resourpol.2022.103239 [CrossRef] [Google Scholar]
  9. Karunasena, G., Fernando, G., Ashokkumar, D., and Liu, C. (2023). Influence of Labour Experience in Generation Construction Material Waste in the Sri Lankan Construction Industry. Sustainability, 15(6), 1–16. https://doi.org/10.3390/su15065406 [Google Scholar]
  10. Liu, F., Zhang, X., Adebayo, T. S., and Awosusi, A. A. (2022). Asymmetric and moderating role of industrialisation and technological innovation on energy intensity: Evidence from BRICS economies. Renewable Energy, 198 (July), 1364–1372. https://doi.org/10.1016/j.renene.2022.08.099 [CrossRef] [Google Scholar]
  11. Ng, S. T., and Tang, Z. (2010). Labour-intensive construction sub-contractors: Their critical success factors. International Journal of Project Management, 28(7), 732–740. https://doi.org/10.1016/j.ijproman.2009.11.005 [CrossRef] [Google Scholar]
  12. Nurhendi, R. N., Khoiry, M. A., and Hamzah, N. (2022). Conceptual Framework Factors Affecting Construction Labour Productivity. Jurnal Kejuruteraan, 34(1), 89–99. https://doi.org/10.17576/jkukm-2022-34(1)-08 [CrossRef] [Google Scholar]
  13. Oladimeji, O. (2022). Influence of COVID-19 pandemic on local construction firms’ viability. Journal of Engineering, Design and Technology, 20(1), 201–221. https://doi.org/10.1108/JEDT-11-2020-0471 [CrossRef] [Google Scholar]
  14. Perera, S., Jin, X., Samaratunga, M., and Gunasekara, K. (2023). Drivers and Barriers To Digitalisation: a Cross-Analysis of the Views of Designers and Builders in the Construction Industry. Journal of Information Technology in Construction, 28 (July 2022), 87–106. https://doi.org/10.36680/j.itcon.2023.005 [CrossRef] [Google Scholar]
  15. Prabhakar, V.V., Belarmin Xavier, C.S., and Abubeker, K.M. (2023). A Review on Challenges and Solutions in the Implementation of Ai, IoT and Blockchain in Construction Industry. Materials Today: Proceedings, 1–13. https://doi.org/10.1016/j.matpr.2023.03.535 [Google Scholar]
  16. Ruan, F. L., and Yan, L. (2022). Interactions among electricity consumption, disposable income, wastewater discharge, and economic growth: Evidence from megacities in China from 1995 to 2018. Energy, 260(1), 1–9. https://doi.org/10.1016Zj.energy.2022.124910 [CrossRef] [Google Scholar]
  17. Salami, M. A., Tanrivermis, H., and Aliefendioğlu, Y. (2023). Interdependence between foreign housing acquisitions and housing price increase in Turkey during the COVID-19 pandemic. International Journal of Housing Markets and Analysis, 16(3), 575–597. https://doi.org/10.1108/IJHMA-08-2022-0109 [CrossRef] [Google Scholar]
  18. Sharif, A., Raza, S. A., Ozturk, I., and Afshan, S. (2019). The dynamic relationship of renewable and nonrenewable energy consumption with carbon emission: A global study applying heterogeneous panel estimations. Renewable Energy, 133, 685–691. https://doi.org/10.1016/j.renene.2018.10.052 [CrossRef] [Google Scholar]
  19. Sharma, R. K., and Bakshi, A. (2019). An evident prescience of determinants of dividend policy of Indian real estate companies: An empirical analysis using co-integration regression and generalised method of moments. Journal of Financial Management of Property and Construction, 24(3), 358–384. https://doi.org/10.1108/JFMPC-02-2019-0012 [CrossRef] [Google Scholar]
  20. Udawattha, C., and Halwatura, R. (2017). Life cycle cost of different Walling materials used for affordable housing in the tropics. Case Studies in Construction Materials, 7(May), 15–29. https://doi.org/10.1016/j.cscm.2017.04.005 [CrossRef] [Google Scholar]
  21. Wong, J. M. W., Chan, A. P. C., and Chiang, Y. H. (2006). The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), 1–17. https://doi.org/10.1108/17260530610818615 [CrossRef] [Google Scholar]
  22. Xu, J., Lou, J., Lu, W., Wu, L., and Chen, C. (2023). Ensuring construction material provenance using Internet of Things and blockchain: Learning from the food industry. Journal of Industrial Information Integration, 33 (March), 100455. https://doi.org/10.1016/jjii.2023.100455 [CrossRef] [Google Scholar]
  23. Zhao, Y., Qi, K., Chan, A. P. C., Chiang, Y. H., and Siu, M. F. F. (2021). Manpower forecasting models in the construction industry: a systematic review. In Engineering, Construction and Architectural Management (pp. 1–20). Emerald Group Holdings Ltd. https://doi.org/10.1108/ECAM-05-2020-0351 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.