Open Access
Issue
E3S Web Conf.
Volume 471, 2024
XIV International Conference on Transport Infrastructure: Territory Development and Sustainability (TITDS-XIV-2023)
Article Number 02004
Number of page(s) 9
Section Engineering, Transport Energy Efficiency and Power Industry
DOI https://doi.org/10.1051/e3sconf/202447102004
Published online 04 January 2024
  1. K.V. Merenchenko, Transport construction 6, 7–9 (2014) [Google Scholar]
  2. K.D. Jones, Structures made of reinforced soil (M.: Stroyizdat, 1989) [Google Scholar]
  3. E.S. Ashpiz, A.V. Zamukhovsky, A.P. Shmakov, A.O. Salmin, A.V. Kuznetsova, Study of the reinforcement of the protective layer with a flat geogrid, In: Modern problems of design, construction and operation of railway tracks. Proceedings of the XIV International Scientific and Technical Conference (Readings dedicated to the memory of Professor G.M. Shakhunyants, 2017), pp. 112–115 [Google Scholar]
  4. E.V. Olkhovskaya, D.V. Serebryakov, Designs of the transition track on the approaches to artificial structures on high-speed and high-speed railways In: Proceedings of the LXXXII All-Russian Scientific and Technical Conference of Students, Postgraduate Students and Young Scientists, Volume 1 (St. Petersburg State Transport University of Emperor Alexander I, St. Petersburg, 2020), pp. 47–50 [Google Scholar]
  5. D.V. Serebryakov, A.A. Konon, V.V. Ganchits, Path and track management 9, 9–11 (2017) [Google Scholar]
  6. S. Fischer, Acta Polytechnica Hungarica 19 (3), 89–101 (2022) [CrossRef] [Google Scholar]
  7. K.I. Ivanova, A.F. Kolos, X. Wang, Brics transport 2 (1), 7 (2023) [Google Scholar]
  8. EBGEO: Recommendations for the design and analysis of soil structures using geosynthetic materials (German Geotechnical Society, 2009) [Google Scholar]
  9. New designs of transition sections from the embankment to the bridge. 760/4. Organization for Cooperation between Railways (OSJD, 2016) [Google Scholar]
  10. D.S. Altynnikov, Designing the development of a regional railway network 5, 32–39 (2017) [Google Scholar]
  11. M.F. Verigo, A.Ya. Kogan, Interaction between track and rolling stock (M: Transport, 1986) [Google Scholar]
  12. E.S. Ashpiz, A.V. Zamukhovsky, World of transport 5, 112–119 (2012) [Google Scholar]
  13. E. Fedorenko, Engineering protection 3 (3), 34–38 (2014) [Google Scholar]
  14. V.V. Marochka, S.G. Boboshko, A.L. Tyutkin, Full-scale tests of sections with a transitional stiffness indicator on the approaches to railway bridges In: Polytransport systems. Materials of the XI International Scientific and Technical Conference (Novosibirsk, 2020), pp. 59–63 [Google Scholar]
  15. S. Shao, S. Ji, Y. Yan, G.L. Xuebao, Chinese Journal of Solid Mechanics 37, 444–455 (2016) [Google Scholar]
  16. A.V. Zamukhovsky, K.V. Marchenko, World of transport 3, 74–82 (2013) [Google Scholar]
  17. V.L. Shapovalov, G.I. Lazorenko, V.A. Yavna, Path and track management 12, 12–15 (2013) [Google Scholar]
  18. V.O. Pevzner, S.S. Nadezhin, A.V. Anisin, VNIIZHT Bulletin 4, 44–47 (2013) [Google Scholar]
  19. V.O. Pevzner, The influence of the rigidity of the sub-ballast foundation on elastic settlements and track loading. Modern problems of design, construction and operation of the railway track: proceedings of the 3rd Scientific and Technical Conference with the international participation of JSC Russian Railways (MIIT, 2006, pp. 120–122 [Google Scholar]
  20. A.V. Sycheva, A.A. Loktev, V.P. Sychev, Track and track management 2, 16–20 (2021) [Google Scholar]
  21. L.A. Illarionova, A.A. Loktev, Introduction of modern designs and advanced technologies into track facilities 17 (17), 55–60 (2021) [Google Scholar]
  22. V.V. Shapran, Introduction of modern structures and advanced technologies into track management 6 (6), 124–131 (2013) [Google Scholar]
  23. A.A. Loktev, A.V. Sycheva, V.P. Sychev, Introduction of modern structures and advanced technologies in track management 18, 62–71 (2022) [Google Scholar]
  24. A.A. Loktev, Acta Mechanica 222 (1-2), 17–25 (2011) [CrossRef] [Google Scholar]
  25. S. Chattopadhyay, Journal of the Acoustical Society of America 82 (2), 493–497 (1987) [CrossRef] [Google Scholar]
  26. B.D. Dzhanmuldaev, A.A. Loktev, K.T. Alenov, Z.T. Fazilova, World of Transport 2 (81), 72–78 (2019) [CrossRef] [Google Scholar]
  27. V.V. Vinogradov, A.A. Loktev, Z.T. Fazilova, World of transport 3, 72–85 (2018) [CrossRef] [Google Scholar]
  28. A.A. Loktev, Z.T. Fazilova, A.A. Zaytsev, N.L. Borisova, Analytical modeling o the dynamic behavior of the railway track on areas of variable stiffness In: Transportation Soil Engineering in Cold Regions. Proceedings of TRANSOILCOLD 2019. Series: Lecture Notes in Civil Engineering, volume 49. (Singapore, 2020), pp. 165–172 [Google Scholar]
  29. A.A. Loktev, A.V. Sycheva, V.P. Sychev, Science and technology of transport 3, 25–30 (2022) [Google Scholar]
  30. O.V. Druzhinina, A.A. Loktev, I.S. Vanyushanik, S.V. Fedorova, D.V. Klimova, Generalized reaction spectra for the design of bridge crossings of transport infrastructure In: Control systems, complex systems: modeling, stability, stabilization, intelligent technologies. materials of the VII International Scientific and Practical Conference (Elets, 2021), pp. 329–334 [Google Scholar]
  31. V.N. Smirnov, E.B. Shestakova, S.V. Chizhov, A.A. Antonyuk, L.A. Lediaev, I.A. Indeykin, E.S. Evtukov, Engineering and Construction Journal 8 (76), 115–129 (2017) [Google Scholar]
  32. A.A. Loktev, E.A. Gridasova, E.V. Zapol’nova, Contemporary Engineering Sciences 8 (17-20), 799–807 (2015) [CrossRef] [Google Scholar]
  33. A. Loktev, V. Sychev, E. Gridasova, R. Stepanov, Nonlinearity. Problems, Solutions and Applications 1, 291–307 (2017) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.