Open Access
Issue
E3S Web Conf.
Volume 474, 2024
X International Annual Conference “Industrial Technologies and Engineering” (ICITE 2023)
Article Number 01071
Number of page(s) 6
Section Energy Sciences, Engineering and Industry
DOI https://doi.org/10.1051/e3sconf/202447401071
Published online 08 January 2024
  1. S. V. Pridvizhkin, Economics and management: problems, solutions 2, 98 (2017) [Google Scholar]
  2. S. G. Sheina, K. S. Petrov, A. A. Fedorov, Construction and technogenic safety 14 (66), (2019) [Google Scholar]
  3. A. A. Antonyuk, S. V. Chizhov, Naukovedenie 9, (2017) [Google Scholar]
  4. V. V. Talapov, A. S. Nesipbayev, A. V. Khapin, B. E. Makhiev, Bulletin of D. Serikbayev EKTU 1, 111 (2022) [CrossRef] [Google Scholar]
  5. V. V. Talapov, News of the higher educational institution. Construction 4, 108 (2016) [Google Scholar]
  6. R. Sacks, L. Koskela, B. Dave, R. Owen, Jour. of Constr. Eng. and Manag 136 (9), 968 (2016). [Google Scholar]
  7. P. Oskouie, D. J. Gerber, T. Alves, B. Becerik-Gerber, Extending the Interaction of Building Information modeling and lean construction. Ann. Conf. of the Intern. Gr. for Lean Cons (2012), pp. 18–20 [Google Scholar]
  8. A. D. Kozlov, Peculiarities of the management of the construction of “transport infrastructure projects” on the basis of information modeling (BIM). Current aspects and priorities of the development of the transport sector (2019), pp. 79–83 [Google Scholar]
  9. N. Sh. Mustafin, A. A. Bary’shnikov, A. M. Spry’zhkov, Regional’noe razvitie 8 (12), 9 (2012) [Google Scholar]
  10. R. Sacks, et al., PCI journal 50 (4), 126 (2005) [CrossRef] [Google Scholar]
  11. L. Ghang, A. Borrmann, Cons. Manag. and Ec. Jour. 5, 413 (2020). [Google Scholar]
  12. G. Trivedi, There are 3 P’s of BIM: people, processes and policies (2017) [Google Scholar]
  13. V. Trivedi, There are four elements involved in BIM management: technology, processes, people and policies (2018) [Google Scholar]
  14. B. Succar, M. Kassem, Autom. in constr. 57, 64 (2015) [CrossRef] [Google Scholar]
  15. G. Lee, H. K. Park, J. Won, Autom. in const. 22, 577 (2012) [CrossRef] [Google Scholar]
  16. F. Leite, et al., Autom. in const. 20 (5), 601 (2011) [CrossRef] [Google Scholar]
  17. S. Jang, et al., Jou.of manag. in engin. 35(6), (2019) [Google Scholar]
  18. G. Lee, J. W. Kim, Autom. in const. 43, 170 (2014) [CrossRef] [Google Scholar]
  19. K. S. Petrov, Inzh. vest. Dona. 2 (45), 89 (2017) [Google Scholar]
  20. D. S. Dronov, Sinergiya Nauk. 10, 529 (2017) [Google Scholar]
  21. G. Lee, et al., Can experience overcome the cognitive challenges in drawing-based design review? Des. rev. experim., International Conference on Construction Applications of Virtual Reality (2016), pp. 12–13 [Google Scholar]
  22. R. Sacks, et al., BIM handbook: a guide to building information modeling for owners, designers, engineers, contractors, and facility managers (2018) [CrossRef] [Google Scholar]
  23. V. A. Osipov, Aktual. vopr. e’k. nauk. 50 (2), 127 (2016) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.