Open Access
Issue
E3S Web Conf.
Volume 573, 2024
2024 International Conference on Sustainable Development and Energy Resources (SDER 2024)
Article Number 02018
Number of page(s) 5
Section Oil and Gas Resources Development and Energy Technology Innovation
DOI https://doi.org/10.1051/e3sconf/202457302018
Published online 30 September 2024
  1. Hao Shijun, Zhang Jing. Development status and prospect of high-efficiency drilling technology and equipment for large diameter rescue wells[J]. Coal Science and Technology, 2021, 49(4): 75–81. [Google Scholar]
  2. Chang Jianghua, Tian Hongliang, FAN Dong, et al. ZMK5530TZJF100 split full hydraulic truck mounted drilling rig [J] Coal Mine Safety, 2022, 50 (11): 103–105. [Google Scholar]
  3. Tian Hongliang, Zhang Yang, Hao Shijun, et al. Technology and equipment for rapid safety construction of emergency rescue channel after mine disaster[J]. Coal Science and Technology, 2021, 47(5): 29–33. [Google Scholar]
  4. Zhang Qingjie; Cheng Li; Yang Xin; Shan Bin; Zhang Tao. Development of Fully Automatic Hydraulic Elevator[J]. Mechanical Engineer, 2023 (12): 113–115 [Google Scholar]
  5. Jingling, Li Xin, Xu Bobing, Wang Xinpeng. Elastic plastic analysis and residual stress study of CDZ350 drill pipe hoist lug[J]. Mechanical Design and Manufacturing, 2021 (08): 181–184 [Google Scholar]
  6. Wang Ruize, Fan Dong, Tian Hongliang, et al. Development and Application of Coalbed Methane Drilling Machine [J]. Metal Mines, 2017 (8): 146–151 [Google Scholar]
  7. Dong Hongbo, Yao Ningping, Ma Bin, et al. Research on electric control automation technology of underground tunnel drilling rig in coal mine [J]. Coal Geology & Exploration, 2022, 48 (03): 219–224. [Google Scholar]
  8. Ding Qingxin, Liu Yujuan, Sun Guangbin, et al. Optimization design of coalbed methane vehicle mounted drilling rig top drive [J]. Coal Mining Machinery, 2010, 31 (8): 54–56 [Google Scholar]
  9. Zheng Wen, Han Songfeng. Research on Loading Test Method of Vehicle mounted Drilling Machine [J]. China Equipment Engineering, 2018, 35 (3): 144–145 [Google Scholar]
  10. Zhao Jiangpeng. Pilot Test of Large Diameter Bundle Down the Hole Hammer Reverse Circulation Drilling Method [J]. Metal Mines, 2015 (10): 121–124Zhou [Google Scholar]
  11. Yin Mao, Zhou Jingling, Xu Bobing. Optimization design of drill pipe elevator structure based on response surface methodology[J]. Mechanical Design and Manufacturing, 2023 (05): 73–76 [Google Scholar]
  12. Liu Qi. Development and Application of Rod Replacement System for Coal Mine Rescue Drilling Machine [J]. Coal Mining Machinery, 2023, 44 (10): 160–163 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.