Open Access
Issue
E3S Web Conf.
Volume 584, 2024
Rudenko International Conference “Methodological Problems in Reliability Study of Large Energy Systems” (RSES 2024)
Article Number 01028
Number of page(s) 5
DOI https://doi.org/10.1051/e3sconf/202458401028
Published online 06 November 2024
  1. Standards for electric energy quality in power supply systems of general purpose:GOST 32144-2013, 2016, 20 p. [Google Scholar]
  2. Electric energy. Electromagnetic compatibility of technical instruments. Control and monitoring of the electric energy quality in power supply systems of general purpose:GOST 33073-2014, 2016, 52 p. [Google Scholar]
  3. Electromagnetic compatibility of technical means. General guidelines on harmonic and interharmonic measuring instruments for power supply systems and connected technical equipment:GOST 30804.4.72013, 2014, 40 p. [Google Scholar]
  4. Electric energy. Electromagnetic compatibility of technical means. Methods of measurement of electric power quality indicators:GOST 30804.4.30-2013, 2014, 58 p. [Google Scholar]
  5. Guidelines for controlling and analyzing the quality of electric energy in general purpose power supply systems. Part 2. Electric energy quality analysis:TCP 183.2-2009, 2009, 32 p. [Google Scholar]
  6. Guidelines for controlling and analyzing the quality of electric energy in power supply systems of general purpose. Part 2. Electric energy quality analysis:GD 153-34.0-15.502-2002, 64 p. [Google Scholar]
  7. Electromagnetic compatibility (EMC). Part 3-6. Standards. Assessment of electromagnetic emission standards for connecting installations that create interferences to power supply systems of medium, high and ultrahigh voltage:GOST IEC/TR 61000-36-2020, 2021, 54 p. [Google Scholar]
  8. Electromagnetic compatibility (EMC). Part 3-6. Standards. Assessment of electromagnetic emission standards for connecting installations that create voltage fluctuations to power supply systems of medium, high and ultrahigh voltage:GOST IEC/TR 61000-3-7-2020, 2021, 58 p. [Google Scholar]
  9. Electromagnetic compatibility. Part 3-12. Standards. Standards for harmonic components of current generated by equipment connected to low-voltage general purpose power supply systems with a current consumption of more than 16 A and not more than 75 A in one phase:GOST 30804.3.12, 2014, 28 p. [Google Scholar]
  10. V.I. Biryulin, D.V. Kudelina, O.M. Larin, Power engineering:research, equipment, technology, 23, (2021). https://doi.org/10.30724/1998-9903-2021-23-5-3-12. [Google Scholar]
  11. Electromagnetic compatibility (EMC). Part 3-11. Standards. Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage power supply systems for equipments with a rated current of not more than 75 A, subject to special connection conditions:GOST IEC 61000-3-11-2022, 2022, 24 p. [Google Scholar]
  12. Electrical substations with a voltage of 35 kV and above. Standards of technological design:Corporate standard 33243.01.216-16, 2016, 198 p. [Google Scholar]
  13. Electromagnetic compatibility of technical means. Part 4. Methods of testing and measurement. Section 15. Flickermeter. Functional and design requirements:GOST IEC 61000-4-15-2014, 2017, 40 p. [Google Scholar]
  14. M.S. Libkind, Higher harmonics generated by transformers (Publishing House of the USSR Academy of Sciences, Moscow, 1962). [Google Scholar]
  15. L.A. Bessonov, Theoretical foundations of electrical engineering. In 2 vol. Volume 1. Electrical Circuits (Urait Publishing House, Moscow, 2023). [Google Scholar]
  16. Controlled shunt reactors for electric networks with a voltage of 110-500 kV. Typical technical requirements:STO 56947007-29.180.03.198-2015, 2015. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.