Open Access
Issue |
E3S Web of Conf.
Volume 508, 2024
International Conference on Green Energy: Intelligent Transport Systems - Clean Energy Transitions (GreenEnergy 2023)
|
|
---|---|---|
Article Number | 08006 | |
Number of page(s) | 9 | |
Section | Sustainability and Decarbonization | |
DOI | https://doi.org/10.1051/e3sconf/202450808006 | |
Published online | 05 April 2024 |
- Y. Kharazishvili, D. Bugayko, V. Lyashenko, V. Sokolovskiy, V. Baranov, “Strategizing for sustainable development of transport systems in the safety dimension. IOP Conference Series: Earth and Environmental Science.” 012025 (2021) [Google Scholar]
- On the approval of the Concept of the state targeted scientific and technical program for the development of the aviation industry for 2021-2030: Decree of the Cabinet of Ministers of Ukraine dated November 11, 2020. No. 1412 Government courier. 2020. November 17 (No. 223). URL: https://zakon.rada.gov.ua/laws/show/1412-2020-%D1%80#Text. [Google Scholar]
- On the approval of the National Transport Strategy of Ukraine for the period up to 2030. Decree of the Cabinet of Ministers of Ukraine of May 30, 2018 No. 430 [Electronic resource]. - Access mode: https://zakon.rada.gov.ua/laws/show/430-2018-%D1%80#Text. [Google Scholar]
- State target airport development program for the period until 2023. Resolution of the Cabinet of Ministers of Ukraine dated February 24, 2016 No. 126. [Electronic resource]. - Access mode: https://zakon.rada.gov.ua/laws/show/126-2016-%D0%BF#Text . [Google Scholar]
- D. О. Bugayko, An Ecosystem Approach to the Revival of the Aviation Industry of Ukraine with an Orientation to the Future. Visnyk ekonomichnoi nauky Ukrainy 1(44), 24-34 (2023). DOI: https://doi.org/10.37405/1729-7206.2023.1(44).24-34. [Google Scholar]
- R. Tsuzuki, Development of automation and artificial intelligence technology for welding and inspection process in aircraft industry. Weld World 66, 20222. 105–116 (2022). https://doi.org/10.1007/s40194-021-01210-3 . [CrossRef] [Google Scholar]
- D. Todd, J. Simpson, The world aircraft industry. Routledge. (2019). [CrossRef] [Google Scholar]
- W. Lin, J. Lu, J. Zhu, L. Xu, Research on the Sustainable Development and Dynamic Capabilities of China’s Aircraft Leasing Industry Based on System Dynamics Theory. Sustainability 14(3):1806 (2022). https://doi.org/10.3390/su14031806 [Google Scholar]
- S.H.A. Rawahi, Z.B. Jamaluddin, A.B. Bhuiyan, The conceptual framework for the resources management attributes and aircraft maintenance efficiency in the aviation industries in Оman. International Journal of Accounting & Finance Review 5(3), 31-40 (2020). https://doi.org/10.46281/ijafr.v5i3.808 . [CrossRef] [Google Scholar]
- G.T. Ho, Y.M. Tang, et.al., A blockchain-based system to enhance aircraft parts traceability and trackability for inventory management. Expert Systems with Applications 179, 115101 (2021). [CrossRef] [Google Scholar]
- S. Pitchaimuthu, J.J. Thakkar, P.R.C. Gopal, Modelling of risk factors for defence aircraft industry using interpretive structural modelling, interpretive ranking process and system dynamics. Measuring Business Excellence, 23(3), 217-239 (2019). [CrossRef] [Google Scholar]
- D. Milambo, J. Phiri, Aircraft spares supply chain management for the aviation industry in Zambia based on the supply chain operations reference (SCOR) model. Open Journal of Business and Management 7(3), 1183-1195 (2019). [CrossRef] [Google Scholar]
- S. Gallego-García, J. Gejo-García, M. García-García, Development of a maintenance and spare parts distribution model for increasing aircraft efficiency. Applied Sciences, 11(3), 1333 (2021) [CrossRef] [Google Scholar]
- D.K. Yadav, A. Kulkarni, H. Yao, A Comparative Study of Managing a Project Using Traditional Management Techniques and a Critical Chain Project Management Methodology in Aircraft Maintenance Field. Journal of Transportation Technologies 12(4), 544-558 (2022) [CrossRef] [Google Scholar]
- G. Gurina, Potential and strategy for the development of Ukraine’s aviation complex. Znanstvena misel journal, Slovenia, #19/2018, 2, 17-18 (2018) [Google Scholar]
- G. Gurina, S. Podrieza, N. Liskovych, Prospects for development of export potential of aviation complex of Ukraine on the basis of public-private partnership, Eurasian journal of analytical chemistry 13, 665-673 (2018) [Google Scholar]
- IСAO Global Aviation Safety Plan for 2023-2025. [Google Scholar]
- Convention on International Civil Aviation (Doc 7300), signed in Chicago on December 7, 1944.SMS Manual. Doc 9859. Quarterly edition. – ICAO, Montreal, 2019. [Google Scholar]
- Annex 19 to the Convention on the International Civil Aviation Organization. “Safety Management”. [Google Scholar]
- Global Air Navigation Plan (Doc 9750) ICAO, Montreal. [Google Scholar]
- Aviation Benefits Report 2019, ICAO (Report based on material of ACI, CANSO, IATA, ICAO, ICCAIA, ATAG). [Google Scholar]
- The European Aviation Safety Programme, EASA, the Member States, the European Commission, the Performance Review Body and Eurocontrol 2011. [Google Scholar]
- 12th edition, EPAS 2023-2025, EASA, 2022. [Google Scholar]
- EUROCONTROL Long-Term Forecast Flight Movements 2008 -2030. [Google Scholar]
- Boeing Commercial Market Outlook 2019–2038. [Google Scholar]
- Airbus Global Market Forecast/ Cities, Airorts&Aircraft, 2019–2038. [Google Scholar]
- Law of Ukraine “On National Security of Ukraine” dated June 21, 2018 No. 2469-VIII. Vedomosti Verkhovna Rada (VVR), 2018. [Electronic resource]. – Access mode: https://zakon.rada.gov.ua/laws/show/2469-19. [Google Scholar]
- Y. Kharazishvili, A. Kwilinski, D. Bugayko, M. Hryhorak, V. Butorina, I. Yashchyshyna, Strategic scenarios of the post-war recovery of the aviation transport sustainable development: The case of Ukraine. Virtual Economics 5(3), 7-30 (2022). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.