Open Access
Issue |
E3S Web of Conf.
Volume 517, 2024
The 10th International Conference on Engineering, Technology, and Industrial Application (ICETIA 2023)
|
|
---|---|---|
Article Number | 05002 | |
Number of page(s) | 8 | |
Section | Sustainable Development | |
DOI | https://doi.org/10.1051/e3sconf/202451705002 | |
Published online | 15 April 2024 |
- W. L. Wei, Y. Q. Chen, Z. Q. Wang, J. H. Wang, X. J. Ren, S. Ma, EUREKAMAG, Research on Runway Blockage Probability through Simulation, (2022) [Google Scholar]
- J. Han, Jaeduk, S. Kim, I. Hwang, Numerical Assessment and Repair Method of Runway Pavement Damage Due to CBU Penetration and Blast Loading. Applied Sciences, 12, 6, (2022) [Google Scholar]
- C. Kenneth, D. Ove, N. R. Jenzen-Jones, G. Marc, Explosive Weapons in Populated Areas: Technical Considerations Relevant to Their Use and Effects, (2016). [Google Scholar]
- B. Liang, Y. Nie, J. Q. Zhou, Y. S. Bai, L. X. Qian, G. P. Feng, C. X. Yu, Y. G. Lu, J. Phys.: Conf. Ser, Numerical simulation of damage effect for runway subjected to explosive loading, (2020) [Google Scholar]
- GICHD, Explosive weapon effects – final report, (2017) [Google Scholar]
- L. Su. Su, Lei, NCOITCS, WBS-based Risk Identification for the Whole Process of Real Estate Project and Countermeasures, (2012) [Google Scholar]
- PMI, Project Management Body of Knowledge, 6, (2017) [Google Scholar]
- V. Elsye, Y. Latief, L. Sagita, MATEC, Development of Work Breakdown Structure (WBS) Standard for Producing the Risk-Based Structural Work Safety Plan of Building, 147, (2018) [Google Scholar]
- C. C. Darongke, Y. Latief, Development of safety cost on upper structure building based on work breakdown structure. Journal of Computational and Theoretical Nanoscience. 17, 2–3, (2020) [Google Scholar]
- S. A. T. M. Rajagukguk, Y. Latief, JOCATN, Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Costs for Building Construction Projects. Case Study: Lower Structure Building, 17, 2–3, (2020) [Google Scholar]
- P. A. Sejati, W. Isvara, Y. Latief, AIP Conf. Proc., Identification of Roof Truss Work Activities for The Jakarta International Stadium Project with Heavy Lifting Construction Method Using Strand Jack Systemm, 2706, (2023) [Google Scholar]
- A. Anggraini, Y. Latief, J. Phys.: Conf. Ser, Development of work breakdown structure standard for safety planning on stadium construction work based on risk, 1858, (2021) [Google Scholar]
- R. A. Amini, Y. Latief, IEOM, Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of road construction project, (2018) [Google Scholar]
- P. D. Saputra, Y. Latief, CEA, Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method, 8, 297–304, (2020) [Google Scholar]
- P. D. Saputra, Y. Latief, IOP Conf. Ser.: Mater. Sci. Eng, Analysis of Safety Cost Structure in Infrastructure Project of Precast Concrete Bridge Based on Work Breakdown Structure (WBS), 830, (2020) [Google Scholar]
- P. D. Saputra, ARCEE, Identification of Precast Parapet Work Activities in Elevated Railway Construction, 2, 51–60, (2021) [Google Scholar]
- N. Purwanti, P. D. Saputra, M. H. Fansuri, A. A. Laksmi, AIER, Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Projects, 203, 271–275, (2021) [Google Scholar]
- A. S. P. Putra, Y. Latief, IOP Conf. Ser.: Mater. Sci. Eng, Analysis of safety cost structure in infrastructure project of cable-stayed bridge based on Work Breakdown Structure (WBS), 830, (2020) [Google Scholar]
- D. V. Aryanto, L. S. R. Supriadi, Y. Latief, IOP Conf. Ser.: Mater. Sci. Eng, Development of WBS Dictionary and Checklist Based on WBS of Railway Construction for Safety Planning, 1007, (2020) [Google Scholar]
- C. P. Hudoyo, Y. Latief, L. Sagita, IOP Conf. Ser.: Earth Environ. Sci., Development of WBS (Work Breakdown Structure) Risk-Based Standard for Planning Cost Estimation at Port Project, 258, (2019) [Google Scholar]
- T. A. Susiawan, Y. Latief, L. S. Riantini, J. Phys.: Conf. Ser., Development of WBS (Work Breakdown Structure) risk-based standard for safety planning at seaport project, 1360, (2019) [Google Scholar]
- D. Sitohang, Y. Latief, L. S. Riantini, IOP Conf. Ser.: Earth Environ. Sci., Development of Risk-Based Work Breakdown Structure (WBS) Standard to Improve Scheduling Planning of Airport Construction Work, 258, (2019). [Google Scholar]
- A. Ramadhan, Y. Latief, L. Sagita, J. Phys.: Conf. Ser., Development of risk-based standardized work breakdown structure for quality planning of airport construction project, 1360, (2019) [Google Scholar]
- F. Leonelli, P. Di Mascio, A. Germinario, F. Picarella, L. Moretti, M. Cassata, A. De Rubeis, AS, Laboratory and On-Site Tests for Rapid Runway Repair, 7, (2017) [Google Scholar]
- V. Widiantoro, M. Ichsan, P. D. Saputra, AIER, Measurement Analysis of Box Girder Production Cycle Times in Indonesia Infrastructure Projects, 203, 6–10, (2021) [Google Scholar]
- D. J. Duncan, Rapid Runway Repair (RRR): An Optimization for Minimum Operating Strip (MOS) Selection, 3025, (2007) [Google Scholar]
- T. Kazda, B. Caves, EGPL, Airport Design and Operation, (2015) [Google Scholar]
- N. J. Ashford, S. Mumayiz, P. H. Wright, Airport Engineering: Planning, Design, and Development of 21st Century Airports, (2011) [Google Scholar]
- PMI, PMBOK GUIDE, A Guide to The Project Management Body of Knowledge, 6, (2017) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.