Open Access
Issue |
E3S Web of Conf.
Volume 517, 2024
The 10th International Conference on Engineering, Technology, and Industrial Application (ICETIA 2023)
|
|
---|---|---|
Article Number | 05004 | |
Number of page(s) | 5 | |
Section | Sustainable Development | |
DOI | https://doi.org/10.1051/e3sconf/202451705004 | |
Published online | 15 April 2024 |
- Dataindonesia,id. Sektor Konstruksi Tumbuh 3,84% 8th pada Kuartal III/2021. September 2022. https://dataindonesia.id/infrastruktur/detail/sektorkonstruksi-tumbuh-384-pada-kuartal-iii2021 (2021) [Google Scholar]
- Waluyo, R., & Aditama, S. Pengaruh Resource Leveling Terhadap Alokasi Tenaga Kerja Pada Proyek Konstruksi. Jurnal Ilmiah Teknik Sipil, 21(2), 118–128 (2017) [Google Scholar]
- Syah, M. S. Manajemen Proyek, Penerbit PT. Gramedia Pustaka Utama, Jakarta (2004) [Google Scholar]
- Ernst, C., & Sarabia, M. The Role of construction as an employment provider: a Worldwide Input-output analysis (2015) [Google Scholar]
- Mawdesley, M. J., & Al-Jibouri, S. Modelling construction project productivity using systems dynamics approach. International Journal of Productivity and Performance Management, 59(1), 18–36 (2010) [Google Scholar]
- Dabirian, S. et al. Dynamic Modelling of Human Resource Allocation in Construction Projects. International Journal of Construction Management, 22(2), 182–191 (2022) [CrossRef] [Google Scholar]
- Lyneis, J. System dynamics applied to project management: a survey, assessment, and directions for future research (2007) [Google Scholar]
- Xavier, A. et. al. Efficient Workforce Planning with a Labour Allocation System. International Journal for Research in Applied Science and Engineering Technology, 11. (2023) [Google Scholar]
- Othman, I. et al. The Framework for Effective Human Resource Management at Construction Site. MATEC Web of Conferences 203. (2018) [Google Scholar]
- e Silva, L. C., & Costa, A. P. C. S. Decision model for allocating human resources in information system projects. International Journal of Project Management, 31(1), 100–108 (2013) [Google Scholar]
- Farashah, A. D., Thomas, J., & Blomquist, T. Exploring the value of project management certification in selection and recruiting. International Journal of Project Management, 37(1), 14–26 (2019) [CrossRef] [Google Scholar]
- Eden, C., Williams, T., Ackermann, F., & Howick, S. The Role of Feedback Dynamics in Disruption and Delay on the Nature of Disruption and Delay (D&D) in Major Projects. The Journal of the Operational Research Society, 51(3), 291 (2000) [CrossRef] [Google Scholar]
- Wang, Y., Goodrum, P. M., Carl,;, Haas, T., & Glover, R. W. Craft Training Issues in American Industrial and Commercial Construction. Journal of Construction Engineering and Management, 134(10), 795–803 (2008) [CrossRef] [Google Scholar]
- Park, M. Model-based dynamic resource management for construction projects. Automation in Construction, 14(5), 585–598 (2005) [CrossRef] [Google Scholar]
- Lee, Z. W., Ford, D. N., & Joglekar, N. Effects of Resource Allocation Policies on Project Durations (2004) [Google Scholar]
- Trammell, M. T. I., Moulton, A., & Madnick, S. E. Effects of Funding Fluctuations on Software Development: A System Dynamics Analysis. EMJ Engineering Management Journal, 28(2), 71–85 (2016) [Google Scholar]
- Ford, D. N., & Sterman, J. D. Overcoming the 90% Syndrome: Iteration Management in Concurrent Development Projects. Concurrent Engineering Research and Applications, 11(3), 177–186 (2003) [CrossRef] [Google Scholar]
- Norhidayah, Kasim, N., & Shamsudin, A. Framework of human resource planning (HRP) influencing factors for local workforce supply in the Malaysian construction industry. Journal of Technology Management in China, 7(2), 177–197 (2012) [CrossRef] [Google Scholar]
- Abbasianjahromi. Hamidreza, & Hosseini, S. A Risk-cost Optimization Model for Selecting Human Resources in Construction Projects. SN Applied Sciences (2019) [Google Scholar]
- Ashiru, A. R., & Ashiru, A. L. The sustainability of human resource planning for construction projects. MATEC Web of Conferences (2019) [Google Scholar]
- Pournader, M., Tabassi, A. A., & Baloh, P. A Three-Step Design Science Approach to Develop a Novel Human Resource-Planning Framework in Projects: The Cases of Construction Projects in USA, Europe, and Iran. International Journal of Project Management, 33, 419–434 (2015) [CrossRef] [Google Scholar]
- Denzin, N. K., & Lincoln, Y. S. The SAGE Handbook of Qualitative Research. Sage Publications (2018) [Google Scholar]
- Nguyen, H. T., & Hadikusumo, B. H. Human resource-related factors and engineering, procurement, and construction (EPC) project success. Journal of Financial Management of Property and Construction, 23(1), 24–39 (2018) [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.