Open Access
Issue
E3S Web Conf.
Volume 535, 2024
XIII International Scientific and Practical Forum “Environmental Aspects of Sustainability of Construction and Management of Urban Real Estate” (ESCM-2024)
Article Number 05012
Number of page(s) 9
Section Innovative, Technical and Information Systems of “Smart City”
DOI https://doi.org/10.1051/e3sconf/202453505012
Published online 11 June 2024
  1. S. Blackburn, J. of Project Management 20, 3 (2002). [Google Scholar]
  2. K. Bagshaw, J. of Operations Research 11 (2021). [Google Scholar]
  3. V. Burkov, I. Burkova, Dichotomous programming method in optimization problems (Central Economic and Mathematical Institute of the Russian Academy of Sciences Moscow, Russia, 2003). [Google Scholar]
  4. V. Burkov, I. Burkova, M. Popok, T. Ovchinnikova, Annals of the Institute of Management Problems under V.A. Trapeznikov of the Russian Academy of Sciences 3 (2005). [Google Scholar]
  5. I. Burkova, Automation and Remote Control 70 (2009). [Google Scholar]
  6. V. Burkov, I. Burkova, Theory of Active Systems 25–26 (2003). [Google Scholar]
  7. I. Burkova, B. Titarenko, A. Hasnaoui, R. Titarenko, Serbian J. of Management 16, 1(2021). [Google Scholar]
  8. I. Burkova, Bulletin of the Voronezh State Technical University 6, 7 (2010). [Google Scholar]
  9. V. Burkov, Mathematical Foundations of Project Management (Higher school, Moscow, Russia, 2005). [Google Scholar]
  10. W. Gutjahr, ORSpectrum 33 (2011). [Google Scholar]
  11. E.R. Gafarov, A.A. Lazarev, F. Werner, On Lower and Upper Bounds for the Resource-Constrained Project Scheduling Problem (Preprint 8/10, FMA, Otto-von-Guericke-Universitat Magdeburg, 2010). [Google Scholar]
  12. V. Kondratjev, A. Tsepkin, Scientific edition of Moscow Automobile and Road Construction State Technical University 4, 59(2019). [Google Scholar]
  13. G. Marcondes, R. Leme, M. Silva, The Engineering Economist 62,1(2017). [PubMed] [Google Scholar]
  14. N. Moiseev, Mathematical problems of system analysis (Nauka, GRFML, Moscow, Russia, 1981). [Google Scholar]
  15. PMBoK Guide. 4-th Edition,PMI (2008). [Google Scholar]
  16. M. Sharifghazvini, Economic computation and Economic Cybernetics Studies and Research 52, 1 (2018). [Google Scholar]
  17. M. Tavano, K. Khalili, A.-R. Abtahi, Annals of Operations Research 206 (2013). [Google Scholar]
  18. B. Titarenko, A. Hasnaoui, R. Titarenko, L. Buzuk, MATEC Web of Conferences 170 (2018). [Google Scholar]
  19. J.R. Turner, R. Müller, International Journal of Project Management 21(2003). [Google Scholar]
  20. L. Yu, S.W. Wen, K.K. Lay, Annals of Operations Research 197, 1(2012). [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.