Open Access
Issue
E3S Web Conf.
Volume 546, 2024
2024 2nd International Conference on Green Building (ICoGB 2024)
Article Number 02009
Number of page(s) 5
Section Green Building Technology and Innovation
DOI https://doi.org/10.1051/e3sconf/202454602009
Published online 09 July 2024
  1. Aghasizadeh, S., et al. (2022). Environmental and Economic Performance of Prefabricated Construction: A Review. Environmental Impact Assessment Review, 97, 106897. [CrossRef] [Google Scholar]
  2. Zhou, J., Tam, V. W. Y., Qin, Y., & Illankoon, C. (2023). A critical review and comparative analysis of cost management on prefabricated construction research (2000-2022). International Journal of Construction Management. [Google Scholar]
  3. Zhu, A., Pauwels, P., & De Vries, B. (2021). Smart Component-Oriented Method of Construction Robot Coordination for Prefabricated Housing. Automation in Construction, 129, 103778. [Google Scholar]
  4. Shang, Z., Wang, F., & Yang, X. (2022). The Efficiency of the Chinese Prefabricated Building Industry and Its Influencing Factors: An Empirical Study. Sustainability, 14(17), 10695. [CrossRef] [Google Scholar]
  5. Hei, S., Zhang, H., Luo, S., Zhang, R., Zhou, C., Cong, M., & Ye, H. (2024). Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China. Sustainability, 16, 656. [CrossRef] [Google Scholar]
  6. Yang, H., Lv, Y., He, Y., & Zhu, J. (2019). Research and Prospect on the Present Situation of Assembled Buildings in China. IOP Conference Series: Earth and Environmental Science, 242, 062083. [CrossRef] [CrossRef] [Google Scholar]
  7. Wu, S., et al. (2016). Incorporating Motion Analysis Technology into Modular Arrangement of Predetermined Time Standard (MODAPTS). International Journal of Industrial Ergonomics, 53, 291–298. [CrossRef] [Google Scholar]
  8. Kumar, R., et al. (2020). Productivity Enhancement of Assembly Line by Using Maynard Operation Sequence Technique after Identification of Lean Wastages. International Journal of Productivity and Quality Management, 29(4), 463. [CrossRef] [Google Scholar]
  9. Dias, P., et al. (2019). Analysis and Improvement of an Assembly Line in the Automotive Industry. Procedia Manufacturing, 38, 1444–1452. [CrossRef] [Google Scholar]
  10. Razmi, J., & Shakhs-Niyaee, M. (2008). Developing a Specific Predetermined Time Study Approach: An Empirical Study in a Car Industry. Production Planning & Control, 19(5), 454–460. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.