Open Access
Issue |
E3S Web Conf.
Volume 561, 2024
The 8th International Conference on Energy, Environment and Materials Science (EEMS 2024)
|
|
---|---|---|
Article Number | 03027 | |
Number of page(s) | 7 | |
Section | Advanced Materials Application and Their Characteristics Analysis | |
DOI | https://doi.org/10.1051/e3sconf/202456103027 | |
Published online | 09 August 2024 |
- Q. Peng. (2024) In 2023, the National Economy shows signs of Recovery, Attention to Opportunities in the Construction Materals sector in 2024, China Building Materials., 02: 104–108. [Google Scholar]
- W. Zhang, X.B. Wang, C. Liu. (2024) Research progress on influence mechanism of lithium slag on mechanical properties of concrete, Cement Guide for New Epoch. 02:11-15. [Google Scholar]
- Y.Z. Wu, H.L. Lv, M. M Zhang. (2023) Freeze-Thaw Resistance of Composite Limestone Powder-Fly Ash-Slag Concrete, Bulletin of the Chinese Ceramic Society. 08: 2808–2820. [Google Scholar]
- Y.R. Jing, S.C. Zhou, J. Chen, H.L. Lv. (2023) Influence of limestone powder fineness on mechanical performance of slag-limestone powder concrete, Concrete. 01: 114–119. [Google Scholar]
- M. Sahmaran, G.T.K. Yildirim, (2013) Erdem. Self-healing capability of cementitious composites incorporating different supplementary cementitious materials. Cement and Concrete Composites, 35: 89–101. [CrossRef] [Google Scholar]
- Z.H. Du, S. Gui, C. Deng. (2018) Microstructure of ultra high performance concrete containing lithium slag. Journal of hazardous materials, 353:35-43. [CrossRef] [PubMed] [Google Scholar]
- A. Mohajerani, L. Burnett, J.V. SMITH, et al. (2020) Recycling waste rubber tyres in construction materials and associated environmental considerations: A review. Resources, Conservation and Recycling, 155: 1–17. [Google Scholar]
- Y. J, Zheng, M.G. Ouyang, X.B. HAN, et al. (2018) Investigating the error sources of the online state of charge estimation methods for lithium-ion batteries in electric vehicles. Journal of Power Sources, 377:161-188. [CrossRef] [Google Scholar]
- Y. HE, Q.L. ZHANG, Q.S. CHEN, et al. (2021) Mechanical and environmental characteristics of cemented paste backfill containing lithium slag-blended binder. Construction and Building Materials, 271: 121567.1-121567.10. [Google Scholar]
- H. Tan, M. Li, X. He, et al. (2020) Effect of wet grinded lithium slag on compressive strength and hydration of sulphoaluminate cement system. Construction and Building Materials, 267: 120465. [Google Scholar]
- H.B. Tan, X. Zhang, X.Y. He, et al. (2018) Utilization of lithium slag by wet-grinding process to improve the early strength of sulphoaluminate cement paste. Journal of Cleaner Production, 205: 536–551. [CrossRef] [Google Scholar]
- Z. Liu, J.X. Wang, L. Li, et al. (2019) Characteristics of Alkali-Activated Lithium Slag at Early Reaction Age. Journal of Materials in Civil Engineering, 12:1-11. [Google Scholar]
- L. Zhang, Y. Pan, K. Xu, et al. (2022) Corrosion behavior of concrete fabricated with lithium slag as corrosion inhibitor under simulated acid rain corrosion action. Journal of Cleaner Production, 377: 1–21. [Google Scholar]
- L.L. Zhang, G.L. Zhu, Z.F. Lu, et al. (2010) Ground lithium slag used for cement and concrete:YB/T 4230-2010, (In Chinses). [Google Scholar]
- C. Liu, B.L. Yan, L.Z. Jiang, et al. (2005) Flow table for determine mortar fluidity:JC/T 958-2005, (In Chinses). [Google Scholar]
- D.T. Zhang, W. Y Wang, X.M. Bai, et al. Test method of cement mortar strength(ISO method): GB/T 17671-202113, (In Chinses). [Google Scholar]
- H.B. Tan, M.G. Li, X.Y. He, Y. Su, et al. (2020) Preparation for micro-lithium slag via wet grinding and its application as accelerator in Portland cement. Journal of cleaner production, 250: 119528.1-119528.14. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.